Loading...
1129 N ACACIA ST (2)Permit Types BLD, ELE MEC PLM c X <-Permit Number: BLD2016-05609 Issued: 11/18/2016 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 91 Site Address:..1129 N ACACIA ST L'egal'Description: N TR 1515 LOT 4 Project Description: Mechanical for FAU change out. (same location) CI (714) 765 - 5153 EIM Valuation: Construcion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 147.67 People Associated with Project: Owner JUAN SEGURA 1129 ACACIA ST ANAHEIM CA 92805-1512 Contractor SPECIALTY A C HEAT 1289 E 7TH ST UPLAND CA 91786 Permit Applicant DAVID AMAYA Type Electrical Fixtures Qty Type"- Plumbing Fixtures Qty Type t - Heating Appliances, including vent Heating/Cooling Coil Residential Registers Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A hew permit is required.to.commerice or continue work. fbld_permit combo 1 1 0 P�Pt1EI1W �qc City of Anaheim o� o Building Division F i U ' DED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the folhOng applicable items have been s' e • Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections q Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (CompactionlMembrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s' e 1st Floor Shear Lim I ' Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Relnf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Strutt., Ele., or Mec.) Grease Interceptor 1 11 Do not backfill unless sinned off) Sewer Water Engineering Backflow, (Testable Only) Water Service