Loading...
1304 N AETNA ST (6)Permit Types BLD ELE MEC PLM X I X Permit Number: BLD2011-03916 Issued: 10/10/2011 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 30 Site Address: 1304 N AETNA ST Legal Description: N TR 2288 LOT 27 [of (714) 765 - 5153 Project Description: Residential Remodel: Replace 4 windows. Electrical to upgrade service to 100amps. EIM Valuation: $800.00 Construcion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 436.02 People Associated with Project: Owner FRANCISCO LOPEZ 1304 N AETNA ST ANAHEIM CA 92801-1506 Permit Applicant FRANCISCO LOPEZ Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Meter/Disc Sw - under 600 V., up to,200 1 amps Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the ' ilding or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required tweommence or continu, York. fbld_permit_combo P�PAEIAl CqC Cityof Anaheim o� �O Building Division F i u a SOUNDED �a�1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items.have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer ,, ,° Sub ListlBus. Lic: (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianedy Building Final (714 765-5153) Last Inspection -Final Only After Above Completed '� J q/J_ �+v Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioneda 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) ' Grease Interceptor (Do not backfoll unless sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service