Loading...
1236 N DRESDEN PL (2)Permit Types BLD ELE MEC PLM X X Permit Number: BLD2023-00393 Issued: 01/25/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 51 CITY OF ANAHEIM Site.Add6ss:;1236.N DRESDEN PL C. ANAHEIM, CA 92801 LegalDescriptl6n: N:TR 3396 BLK LOT 17 APN:.07338436 BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765-5153 Project Description: Mechanical and plumbing to install water heater and wall heater Living Area: Number of Stories: 1 Valuation: 0.00 Garage Area: Construction Types: WA Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinldered: Cool Roof. Total Fees paid for Penult: 262.00 People Associated with Project: Contractor RELIABLE ENERGY MANAGEMENT INC 6829 WALTHALL WAYABCDE11161521 PARAMOUNT, CA 90723 Owner GOODMAN ANH 925 S SUSAN ST Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Water Heater 1 Heating Appliances, including vent 1 Ventilation Fan - — 300 cfm on single duct 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�rNE114 Cq< City of Anaheim o� io Building Division F z U > �oGNDED Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable Items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subiloor or pour floor slab until the follwing applicable items have been Building Final (714 765.5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildina Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned- 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Olaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbina Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New rurfinn Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sinned ofn Sewer Water Engineering Backflow (Testable Only) Water Service