Loading...
180-190 W ELM ST (3)Permit Types BLD ELE MEC PLM X Permit Number: BLD2016-05405 Issued: 02/25/2019 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 84 Site Address: 180-190 W ELM ST Legal Description: ORIGINAL CITY LOTS -ANAHEIM LOT 60 C 200 SMANAHEWBI. (714) 765 - 5153 EIM Project Description: Trash Enclosure: 30 In.ft. X 6ft. high CMU wall with 93 sq.ft. canopy top built per plan. REF: BLD2016-05402 Valuation: $2,000.00 Construcion Types: N/A, , Fire Sprinklered? No Cool Roof NO Total Fees paid for Permit: 776.25 People Associated with Project: Permit Applicant JUAN HERNANDEZ Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence dt continue work. fbld�ermit_combo P�PHEIM CqC City of Anaheim D� io Building Division F i U > �D4NDED. Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654260 Engineering Final (714) 7655126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days) SetbacklFonm/Trenches (Footings) IVA COAIMIgation Measures Do not install subfloor be pour floor slab until the follwing applicable items have been s' Building Final (714 765-5153) Last Inspection final Only After Above Completed 2 Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) , Do not cover or conceal the work below until the following applicable items have e• 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphragmlFrame) Masonry (ReinfJBond'SeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical . Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (SoundlEnergy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Latif Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Strutt., Ele., or Mec.) Grease Interceptor (Do not backfill sinned ofn -unless Sewer Water Engineering Backflow (Testable Only) Water Service