Loading...
1931 N ELDER GLEN CIR (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2022-04646 Issued: 09/30/2022 www.anaheim.net/building (714)7654626 Quarter Section: 177 CITY OF ANAHEIM Site, Address:. 1931 N ELDER GLEN CIR, ANAHEIM, CA 92807 Legaf Descriptfik N TR 4693 BLK LOT 47 APN:34324151 BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765.5153 Project Description: Mechanical: Change out air condenser, (1) coil, furnace and (7) ducts. Living Area: Number of Stories: t Valuation: 0.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spdnldered: Cool Roof: Total Fees paid for Permit: 397.00 People Associated with Project: Permit Applicant Emalee Joseph Owner VUKELISH SHERI 1931 N ELDER GLEN CIR Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Evaporative or Air Cooled Condenser 1 Heating Appliances, Including vent 1 Heating/Cooling Coil 1 Residential Registers 7 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. City of Anaheim FINAL INSPECTIONS items below must be 0.s- 4 DATE IINSPECTOR before utilities are released Irswaing ulvlslon Aix r2 Final Gas Test U a Electrical Final Plumbing Final DED �a�^ echanical Final Cross Connection Control (714) 765-4280 Do not occuov this building until the final inspections have been made. Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler, (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed7 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service