Loading...
138 S GILBERT ST (3)Permit Types (/ ee1� BLD ELE MECr-X- LM �0 �'pc4 1��� X X X of .r o i Permit Number: BLD2016-00517 Issued: 03/23/2016 CITiYrOfA _A3HEIM INSPECTION REQUEST LINE: `` "- ?-/ it BUIL "ING�DI1 §t t (714) 765 - 4626 �«q���'q �y ' 200 S. 4) 76 EIM�53D. Quarter Section: 33 (714) 765 - 5153 Site Address: 138 S GILBERT ST Legal Description: P BK 115 PG 40 PAR 6 Project Description: Residential Remodel: 452 sq. ft. interior remodel to create bedroom #5 with W.I.C, bathroom #4 to existing laundry room with infill of door opening, and new bathrooms #5 & 6. Install 18 retro -fit windows (like for like). 45 sq. ft. to create bathroom in existing workshop. REF: INV2015-00623 Valuation: $15,000.00 Construcion Types: VB, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 3,211.05 People Associated with Project: Engineer HUE C LIU 10732 LA BATISTA AVENUE FOUNTAIN VALLEY CA 92708 Permit Applicant ; . DENNIS RUEBSAMEN ~ . Type Electrical Fixtures ti rt my Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Sub Panelfremp Pwr < 600 V; 0 <, amps 1.tiBath Tub 1 Ventilation Fan - <= 300 cfm on single duct 3 <= 200 'L'a`vatory 3 Receptacle, switches, lights 26 Water Closet 3 �% I .°t 1 � ��`r - Repair/Drainage Alteration/Vent Piping 1 • -' ` ' Wafer Distribution 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbid_permit_combo P�PHEIM Cq< City of Anaheim °� �o Building Division F i u ' NnEo �sy^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub Llst/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) CONMigatlon Measures Do not install subfloor or pour floor slab until the follwing applicable items have been si ned: Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Ins esti R I T EXPIRED Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Jolst/Glyders) iiIPE C T! 0 N Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been si ed: DATE' — 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) �a J Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Strutt., Ele., or Mec.) Grease Interceptor 0 not backfill unless sianed ofn Sewer Water Engineering Backflow (Testable Only) Water Service