Loading...
1301 W GLEN DR (2)Permit Types BLD ELE MEC PLM X I X Permit Number: BLD2016-03745 Issued: 08/03/2016 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 51 Site Address: 1301 W GLEN DR Legal Description: N TR 2270 LOT 19 CI 200 SM-ANAHEIM0BLVD. (714) 765 - 5153 Project Description: Mechanical for new air conditioning unit and FAU with ductwork and electrical. People Associated with Project: . Owner ANDREW BRIAN MITCHELL Contractor NEXGEN AIR CONDITIONG AND HEATING I Permit Applicant CODY JAEGER Type Electrical Fixtures Qty .Type Motors - up to 1 h.p. 1 Receptacle, switches, lights EIM. Valuation: Construcion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 456.76 12916 REINDEER CT RIVERSIDE CA 92503-4508 2101 W CRESCENT AVE 3B ANAHEIM CA 92801 Plumbing Fixtures Qty Type Mechanical Fixtures Qty Compressor/Boiler - up to 15 hp 1 Heating Appliances, including vent 1 Heating/Cooling Coil 1 Residential Registers 10. The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo , City of Anaheim Building Division Do not occupy this building until the final inspections have been made. INSPECTION I DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been sianedi Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s' 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless Maned offi Sewer Water Engineering Backflow, (Testable Only) Water Service FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765.5041 Fire Dept. Final (714) 765.5041 Water Engineering (714) 765-4591 Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) COAIMigation Measures Building Final (714 765-5153) Last Inspection -Final Only After Above Completed PARTIAL INSPECTIONS Buildinq In a9i ' q %:`, 1 Mechanical Inspections VIJ:i i.. / =2 DATE: - Plumbing Inspections Electrical Inspections ni n T Mechanical Inspections VIJ:i i.. / =2 DATE: - Plumbing Inspections Electrical Inspections