Loading...
2553 W GLENOAKS AVE (3)Permit Types BLD ELE MEC PLM X Permit Number: BLD2023-00572 t9E' Issued: 02/02/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 25 CITY OF ANAHEIM Site Address: 2553 W GLENOAKS AVE, ANAHEIM, CA 92801 Legal:bescriptlon: N.TR 1948 BILK LOT 75 APN: 07-127521 Project Description: Mechanical to change out wall heater BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765-5153 Living Area: Number of Stories: 0 Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spdnklered: No Cool Roof: Total Fees paid for Permit: 167.00 People Associated with Project: Contractor FRINJ ENERGY -HEATING &AMP; AIR CONDITI 971 WINSTON CIRCLE CORONA, CA Permit Applicant Thomas Collins Owner WILLIAMS JOHN A TR 2553 W GLENOAKS Type Electrical Fixtures Qty Type Plumbing Fixtures Gly' Mechanical Fixtures Qty Heating Appliances, Including vent 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�PNeIM Cq< FINAL INSPECTIONS DATE INSPECTOR City of Anaheim O� All applicable items below must be signed before utilities are released Dulloing UIv151on F y Final Gas Test > Electrical Final Plumbing Final neo �$h^ ei:hanical Final _ r 62 Cross Connection Control (714) 7654280 Do not occupy this building until the final inspections have been made. Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed7 BCildl:ng �Fina)1714 765-5153) Lenal 0 ly After Above Compl e Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s4ane& 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough uct (Mechanical) JF A ough Mechanical ougn ectrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service