Loading...
2560 W GLENOAKS AVE (3)Permit Types BLD ELE MEC PLM X X Permit Number: BLD2023-02151 Issued: 05/24/2023 www.anaheim.net/building (714)765-0626 Quarter Section: 25 CITY OF ANAHEIM Site Address: 2560 W GLENOAKS AVE, Anaheim, CA 92801 Legtil Descrtption: N TR 1948 BLL LOT 70 APN:07128302 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765.5153 Project Description: Photovoltaic System: Installation of residential roof mounted system with (9) modules and (1) inverter Living Area: Number of Stories: 1 Valuation: 16,000.00 Garage Area: Consbucdon Types: VB Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: No Cool Roof: Total Fees paid for Permit: 611.34 People Associated with Project: Contractor SOLCIUS LLC 1555 NORTH FREEDOM BLVD201612211122149732 PROVO, UT 92503 Owner JUNIO. ALFREDO N & ROSA G 2560 W GLENOAKS AVE Engineer - Civil Arlo Edward Hulick 7114 Stili Haven Dr Richmond, TX 77407 Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures City Inverter 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�PNEIM Cq< Cityof Anaheim D� �o Building Division F y a �DU�►DED Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned: Building Final (714 765-5153) Last Inspection-Final Only After Above Completed z( /u Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girdem) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sbaned ofn Sewer Water Engineering Backflow (Testable Only) Water Service