Loading...
3156 W GLEN HOLLY DRPermit Types BLD ELE MEC PLM X Permit Number: OLD2023-01267 Issued: 03/16/2023 ' www.anaheim.net/building (714)765.4626 Quarter Section: 10 CITY OF ANAHEIM Site Address:.3156 W GLEN HOLLY DR, ANAHEIM, CA 92804 Legal Description: N TR 4679 BLK-LOT 7 APN:07988207 BUILDING DIVISION 200 S. ANAHEIM BLVD. 1714) 765.5153 Project Description: Plumbing to install two-way sewer cleanout in front yard and for re -drain Living Area: Number of Stories: 1 Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permh: 276.00 People Associated with Project: Contractor ROOTER HERO PLUMBING 11150 SEPULVEDA BLVD STE 2A201804181246247567 MISSION HILLS, CA 92805 Permit Applicant Luminitsa Cercel Owner DAVIN A LENORA 3156 W GLEN HOLLY DR Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Repair/Drainage AtterationNent Piping 1 Sewer per 100 ft. "s 1 The permit shall expire by limitation and become null and vold if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�PNEIM Cq< City of Anaheim o� io Building Division F i U > �D�NDED Do not occupy this buildino until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable Items below must be signed before utilities are released Final Gas Test Electric I Final 1 lumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAT ' tion Measures Do not install subfloor or pour floor slab until the follwing applicable items have been wilding Final (71 765-5153) astInspectlon-F LOnly After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbina Ins ections Framing (Only after Plbg., Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Constructinn Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service