Loading...
222 S HARBOR BLVD (48)Permit Types BLD ELE MEC PLM X X Permit Number: BLD2023-01377 Issued: 04/10/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 72 Site Address: 222 S HARBOR BLVD, ANAHEIM, CA 92805 Legai Description: P BK 194 PG 22 PAR 1 APN: 03619128 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765.5158 Project Description: Tenant Improvement: Remove and replace fire pump on new concrete pad in basement. Living Area: Number of stories: 0 Valuation: Garege Area: Carport Area: Balcony / Deck Area: Cool Roof: Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: 150,000.00 N/A 975.00 People Associated with Project: Contractor 1 TEAMWORK FIRE PROTECTION 4533 MAC ARTHUR BLVD STE 5170201701060914210439 NEWPORT BEACH, CA 90638 Permit Applicant 1 TEAMWORK FIRE PROTECTIO 4533 MACARTHUR BLVD NEWPORT BEACH, CA 92660 Owner ANAHEIM CITY CENTRE PROPERTY LLC 200 PINE AVE 502 Type Electrical Fixtures Qty Type Plumbing Fixtures City Mechanical Fixtures Qty Miscellaneous Fixture 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permft Is required to commence or continue work. P�PHEIM C9C Cityof Anaheim D� �o Building Division F i u a �DUNDED 01 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) . COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been slaneds Building Final (714 765-5153) Last Inspection-Final Only After Above Completed 21, Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been Manedo 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not hackfill unless sinned offi Sewer Water Engineering Backflow (Testable Only) Water Service Permit Types BLD ELE MEC PLM X X Permit Number. OLD2023-01377 Issued: 04/10/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 72 Site Address: 222 S HARBOR BLVD, ANAHEIM, CA 92805 Legal Description: P BK 194 PG 22 PAR 1 APN: 03619128 CITY OF ANAHEIM BUILDING DMSION 200 S. ANAHEIM BLVD. 1714) 765-5153 WORKER'S COMPENSATION DECLARATION: WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OR THE LABOR CODE. INTEREST, AND ATTORNEY'S FEES. I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to self4nsure for worker's compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 1 have and will maintain worker's compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My worker's Compensation insurance carrier and policy are: Cartier. CLEAR SPRING PROPERTY AND CASUALTY COMPANY Policy No.: CINCO1346100 Expiration Date: 11216f2023 Name of Agent Phone No.: I certify that in the performance of the work for which this permit Is issued, I shall not employ any person in any manner so as to become subject to the workers compensation laws 1 amia, and agree that, if I should become subject to the workers compensation provisions of Section 3700 of the P70e, I shall to �ty with those provisions. —ROW ignature �&Appficant Date DECLARATION REGARDING CONSTRUCTION LENDING AGENCY: I hereby affirm under penalty of perjury that there Is a construction lending agency for the performance of the work for which this permit is Issued (Sec.3097.Civ.C): Lenders Name: Lenders Address: LICENSED CONTRACTOR'S DECLARATION: I hereby affirm under the penalty of Pedury that I am 'wed under provisions of chapter 9 (commencing with Section 7000) of Division 3 of the Business and :ntractor essions my license is In full fo a act. Signature D ite NUMBER EXPIRATION DATE LICENSE TYPE ISI 954763 11/30/2024 C16