Loading...
1313 S HARBOR BLVD (365)Permit Types BLD ELE I MEC I PLM X Permit Number: BLD2018-02989 Issued: 07/11/2018 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 75 s Site Address: 1313 S HARBOR BLVD 7600 (Matterhorn Bobsleds) q•.A Legal Descriptjon: C 200 S�N. ANEIMsBL (714) 765 - 5153 Project Description: Electrical to replace feeders and disconnect for Matterhorn Bobsleds catch motor. EIM Valuation: Construcion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 292.61 People Associated with Project: Owner WALT DISNEY WORLD CO %WALT DISNEY CO. TAX DEPT P 0 BOX 4741 GLENDALE CA 91 Contractor MORROW MEADOWS CORPORATION 800 SOUTH HARBOR BLVD 120 ANAHEIM CA 91789 0000 Permit Applicant RAY MARRERO Type Electrical Fixtures Qty Type Motors - up to 1 h.p. 2 Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo EIM PSP Cq< Cityof Anaheim D� H�O Building Division i U > �DVNDED �$y^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765.5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follWng applicable items have been sinned: Building Final (714 765-5153) Last Inspection -Final Only After Above Completed 1 o Plumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoistlGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. &Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service