Loading...
1313 S HARBOR BLVD (398)Permit Types BLD I ELE MEC PLM X Permit Number: BLD2018-01049 Issued: 04/13/2018 CI INSPECTION REQUEST LINE: " fMd.Ik """"ly, 'Al BUIL-DING�DIV�ISIO (714) 765 - 4626 200 'S§ VD. Quarter Section: 75 (714) 765 - 5153 Site Address:- S HARBOR BLVD 6901 (Gadgets Go Coaster) Legal -Descfiption: EIM Project Description: Disney - Mickey's Toontown / Gadgets Go Coaster - Berm Stairs - Tenant Improvement: Installation of new stairs located on existing berm. Valuation: $80,000.00 Construcion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 1,874.81 People Associated with Project: Owner WALT DISNEY WORLD CO %WALT DISNEY CO. TAX DEPT P O BOX 4741 GLENDALE CA 91 Engineer RICHARD NORA 1313 S. HARBOR ANAHEIM CA 92802 Engineer GATES BROWNE 1313 HARBOR ANAHEIM CA Permit Applicant STEPHEN MANAMON s 1313 S. HARBOR BLVD ANAHEIM CA 92802 Type Electrical Fixtures '� 4 Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty, 3i f The permit shall expire by limitation and become, and void if the building or work has not passed final inspection 365 days from the date of — permit issuance. A new permit is required to'commence or continue work. fbld_permit_combo P� EI Oq` City of Anaheim P""' O� io Building Division F i > �OUNDEO Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION DATE1 INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) V7 COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items ave been sinned: Building Final (714 765-5153) Last Inspection-Final Only After Above Completed 0 Z� Por Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections PER144A Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) t Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) vJIVIrLL LE[) Do not cover or conceal the work below until the following applicable items have been s' D 1st Floor Shear - Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (ReinE/Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Constructoon Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service