Loading...
1313 S HARBOR BLVD (464)Permit Types BLD ELE MEC PLM X Permit Number: BLD2016-00723 Issued: 02/12/2016 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 75 Site Address: 1313 S HARBOR BLVD Legal Delscription: 200 SM _ AHEIMLVD. (714) 765 - 5153 Project Description: Demolition of 1,500 sq.ft Building # 9053 Carriage Bldg. REF:BLD2015-06770 EIM Number of Stories 1 Valuation: $5,250.00 Construcion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 239.70 People Associated with Project: Owner WALT DISNEY WORLD CO %WALT DISNEY CO. TAX DEPT P O BOX 4741 GLENDALE CA 91 Permit Applicant IRMGARD BERRY Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo City of Anaheim �NPHEiM �q< o� !ro Building Division F z C ' Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765.5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned: Building Final (714 765.5153) Last Inspection-Final Only After Above Completed I� Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s' e 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbina Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sianed ofn Sewer Water Engineering Backflow, (Testable Only) Water Service