Loading...
1313 S HARBOR BLVD 9090cermit Types BLD ELE MEC PLM X Permit Number: BLD2022-05005 Issued: 10/20/2022 www.anaheim.net/building (714)765-0626 Quarter Section: 75 lei iftlff_1►1_l:14li`il BUILDING DIVISION 200 S. ANAHEIM BLVD. (711411765-5153 N ' Site Address: 1313 S HARBOR BLVD 9090, ANAHEIM, CA 92802 Legal Description: S TWP 4 RGE 10 SEC 22 T 4 R 10 SEC 22 FOR OF SEC A ; APN: 08219019 Project Description: Mechanical to support Disney - BOH/East Chiller Plant - Tenant Improvement Living Area: Number of Stories: 0 Valuation: 0.00 Garage Area: Construction Types. • WA Carport Area: Occupancy Groups: Balcony I Dock Area: Fire Sprinldered: No Cool Roof: Total Fees paid for Permit: 796.00 People Associated with Project: Permit Applicant Tyler Truong Owner WALT DISNEY WORLD CO %WALT DISNEY CO. TAX DEPT P O BOX 4741 GLENDALE, CA 91222 Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Commercial System per 1,000 sq. ft. 1 Miscellaneous Appliance 1 Processing, Special or Hydronic Piping per 2 100 ft. Ventilation Fan - > 300 ctm on single duct 5 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�PHEow �q< City of Anaheim D� �O Building Division r i U > �DVn+DED day^ Do not occupy this building until the final•insaections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned: Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) I Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) - q-2nd Floor (Floor Nailing) U/-X I 16 !� Do not cover or conceal the work below until the following applicable items have been sinned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath N Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service Permit Types BLD ELE MEC PLM X Permit Number. BLD2022-05005 Issued: 10/20/2022 VANw.anaheim.net/building (714)765.4626 Quarter Section: 75 CITY OF ANAHEIM BUILDING DMSION 200 S. ANAHEIM BLVD_ . (714) 166 '515.3. Site Address: 1313 S HARBOR BLVD 9090, ANAHEIM, CA 92802 Legal Description: S TWP 4 RGE 10 SEC 22 T 4 R 10 SEC 22 POR OF SEC A APN:08219019 WORKER'S COMPENSATION DECLARATION: WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE•IS UNLAWFUL, AND SHALL. SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OR THE LABOR CODE. INTEREST, AND ATTORNEY'S FEES. ' I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to selfdnsure for worker's compensation, issued by the Director of Industrial Rellitions as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 1 have and will maintain worker's compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit Is issued. My worker's Compensation insurance carder and policy are: Cartier. NATIONWIDEMUTUAL INSURANCE COMPANY Policy No.: ACPWC3110166057 Expiration Date: 9/1/2023 Name of Agent:. 'I/ 1 LFZ -T 1 W &- Phone No.: -i i g `{ 11•( ` 3 c)O I certify that in the performance of the work for which this permit is issued, I shall not employ any person In any manner so as to become subject to the worker's compensation laws of California, and agree that, If I should become subject to the worker's compensation provisions of Section 3700 of the or " hell th comply with those provisions. t O ['d0 �o-V -'� Signature of pldcant Date DECLARATION REGARDING CONSTRUCTION LENDING AGENCY: I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is Issued (Sec.3097.Civ.C): Lender's Name: Lender's Address: LICENSED CONTRACTOR'S DECLARATION: I hereby affirm under the penalty of Perjury that 1 am licensed under provisions of chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is In full force and effect. 17 101,10 I aGao�1 Contractor nature Date NUMBER EXPIRATION DATE LICENSE TYPE ISI 291740 06/3112023 B, C-4, C16, C20, C36, A j Permit Types BLD ELE MEC PLM 9 X Penna Number: BLD2022-05005 Issued: 10/20/2022 www.anaheim.rlet/building (714)765-4626 Quarter Section: 75 CITY OF ANAHEIM BUILDING DMSION 200 S. ANAHEIM BLVD. (714) 765-5153 Site Address: 1.313 S HARBOR BLVD 9090, ANAHEIM, CA 92802 Legal Destirlptitin: S:TWP 4 RGE:10 SEC 22 T 4 R 10 SEC 22 POR OF SEC A APN: b82190119 Project Description: Mechanical to support Disney - BOH/East Chiller Plant - Tenant Improvement Living Area: Number of Stories: 0 Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups. Balcony I Dock Area: Fire Spdnldered: No Cool Roof Total Fees paid for Permit: 796.00 People Associated with Project: Permit Applicant Tyler Truong Owner WALT DISNEY WORLD CO %WALT DISNEY CO. TAX DEPT P 0 BOX 4741 GLENDALE, CA 91222 Type Electrical Fixtures Qly Type Plumbing Fixtures Qty Mechanical Fixtures Qty Commercial System per 1,000 sq. ft. 1 Miscellaneous Appliance 1 Processing, Special or Hydronic Piping per 2 11001 Ventilation Fan - > 300 ch on single duct 5 0 The permit shall expire by limitation and become null and void If the building or worts has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue worts. P�PHEIM �qC Cityof Anaheim o� �O Building DivisionF �'y u > OU�►DED `gy Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been e 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Ins ections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service 0 ,1; -- M 1'1C .c Moy A 2023 ONWOFAMholm Maeodwm Bhd awb 1a: ch o blenrylond Resort Bulldlna - Past Chiller NO Chiller 4 Rnplacament • Permit number (BLDZ0ZZ�005) • Pr4sot addMM (1313 a. Harbor Blvd. 9090. Anaheim, CA =02) Our Modwowwro b Behead Rabbadeh am the ualnm of mW Ibrabon olhronoed pfo)oa I hm vMled the elle and pe A --Md the bMd Orton of Me dMor 4 and No p"W I Wft w a~ 90 The pW Is =npMW and NOW In acwftnca vNh tit applovad Pian. Si mmly yours. &.fit San RoWft ah/ CEO MEDS InUmdonal Inc 401 Oaw111at Aaiena.. •+a NCO . G�tu1o�*. G ND•O1 VS.- 018-"19-144M. PAN: SIB-"W-1AMR . W M.1410"NNINORM.0oM March 29, 2023 City Of Anaheim 200 S Anaheim Blvd Suite 162 Anaheim, CA 82805 Subject: Disneyland Resort Building — East Chiller Plant Chiller 4 Replacement Dear MadamelSlr; I, Behzad Rabizadeh, am the engineer of record for above referenced project. I have visited the site and reviewed the Installation of the chiller 4 and its piping. I hereby acknowledge that: The project is progressed and installed in accordance with the approved Plan, and ready for start up. Sincerely yours, r Ben Rabizadeh, CEO MEDG International Inc 7131 GUNUMA Avewwt. BT8 21313 , J3IQhDAL13I CA 8't601 . TeL: 616.645.1446 - FAs: 81e-647.6666 . W".Ml:9)QENOIN[Cg6.00M