Loading...
1334 S HICKORY ST (3)Permit Types _ BLD ELE MEC PLM X X Permit Number: BLD2017-00620 Issued: 02/14/2017 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 86 .Site.Address: 1334 S HICKORY ST Legal Desc riptior>i: N -TR'2005'LOT 38 Project Description: Mechanical to replace furnace (same location) People Associated with Project: CI 200 SNANVAHEIMBLVD. (714) 765 - 5153 EIM Valuation: Constructon Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 241.23 Owner ALVIN HERBERT SCHMIDT 14158 S LELAND RD OREGON CITY OR 97045-9124 Contractor MICHEL KHAC SU 14071 HOPE ST #A GARDEN GROVE CA 92843 0000 Permit Applicant MICHEL KHAC SU 14071 HOPE ST #A GARDEN GROVE CA 92803 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Receptacle, switches, lights 3 Heating Appliances, including vent 1 Gas System (1-5 outlets) 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo P�PNEIM Cq< City of Anaheim O� �o Building Division F z u a SOUNDED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final 2,— �, Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been si ned• Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s' e : 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Constructnan Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service