1515 S HARBOR BLVD (364)r-- Permit Types BLD ELE MEC PLM X Permit Number: BLD2016-01998 Issued: 05/16/2016 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 76 Site Address:. 1515 S HARBOR BLVD 304 HYPERION THEATRE Legal Description: C (714) 765 - 5153 EIM Project Description: DCA - Hollywood - Hyperian Theatre BLD304 - Storage Racks: Phase 1; 30 In.ft, 10' high temporary storage racks. Phase 2: 44 linear ft. X 16 ft. high storage rack for new storage room. REF:BLD2016-01942 Valuation: $8,520.00 Construcion Types: N/A, , Fire Sprinklered? Yes Cool Roof No Total Fees paid for Permit: 687.05 People Associated with Project: Engineer KENNETH E AGEE SE3340 3452 E FOOTHILL 626-432-5850 PASADENA CA 91107 Engineer AMY M BRAUN 148 E FOOTHILL BLVD STE 101 ARCADIA CA 91006 Owner WALT DISNEY WORLD CO %WALT DISNEY CO TAX DEPT P O BOX 4741 GLENDALE CA 91 Permit Applicant MARK HOLLINGWORTH Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbid_permit combo City of Anaheim Building Division Do not occupy this building until the final inspections have been made. INSPECTION I DATE INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been sioned7 Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane ReinE) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been slanadb 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (ReinElBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Plbg., Ele., Mee. & Fre) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sqanad offi Sewer Water Engineering Backflow (Testable Only) Water Service FINAL INSPECTIONS I DATE I INSPECTOR All applicable Items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765-4591 Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) COA/Migation Measures Building Final (714 765-5153) �' Last Inspection -Final Only After Above Completed C PARTIAL INSPECTIONS Building Inspections Mechanical Inspections Plumbing Inspections Electrical Inspections