Loading...
1617 S HUMOR DRI - Permit Types t B' ELE MEC PLM �X + X PernAt Number: BLD2022-05661 Issued: 12/01/2022 www.anaheim.net/building (714)765.4626 Quarter Section: 50 Site Addmss:.1617 S. HUMOR DR; ANAHEIM, CA 92804 Legal Descriptlon;.N TR 3177 BLK LOT 2 APN:.128�52205'' CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (71141765 - 5153 Project Description: Residential Photovoltaic System with Microinverters UNUM P\f Living Area: Number of Stories: Veluadon: 36,718.00 Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinidered: Cool Roof: Total Fess paid for Permit: 263.77 People Associated with Project: Permit Applicant Jake Shim 6970 Aragon Circle #3 Buena Park, CA 90620 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures -• Qty- Meter/Disc Sw - Under 600 V, up to 200 1 amps- Microinverter 22 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. P�Pp1EIM oq< Cityof Anaheim D� io Building Division F z u a DED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INS ECTOPC All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been signed: Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (no nnt hackfill unless sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service