Loading...
1812 W HARLE AVE (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2022-05839 Issued: 12/09/2022 www.anaheim.net/building (714)7654626 Quarter Section: 50 Site Address: 1812 W HARLE AVE; ANAHEIM, CA 92804 Legal Descriptlon: N TR 3147 BLK LOT.14 APN: 12850405 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. 17141 765 - 5153 Project Description: Plumbing to Install water softener and tankless water heater in garage Living Area: Number of Stories: 0 Valualion: 0.00 Garage Area: Construclon Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof. Total Fees paid for Permit: 184.00 People Associated with Project: Permit Applicant ben medina Owner EVANGELISTA PATERNO BONGOLTO JR 8 B 1812 W HARLE AVE Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Gas System (outlets) 1 Water Distribution 1 Water Heater 1 Water Softener 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�PHEIM Cq< City of Anaheim o� io Building Division F z u a DED ugh^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been si ned: Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sonned ofn Sewer Water Engineering Backflow (Testable Only) Water Service