Loading...
755 N JANSS ST (2)Permit Types BLD ELE MEC PLM X I X X X Permit Number: BLD2016-01952 Issued: 04/20/2016 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 61 Site Address: 755 N JANSS ST Legal Description: N TR 1493 LOT 2 C 200 Si�AVAHEIMSL (714) 765 - 5153 EIM Project Description: Residential Remodel: Kitchen and bathroom remodel to install tile at shower area with electrical mechanical and plumbing. Valuation: $14,000.00 Construcion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 572.06 People Associated with Project: Owner AARON H BENDIX 755 N JANSS ST ANAHIEM CA 92805-2569 Contractor K M D CONSTRUCTION INC 5641 AMBERDALE DR YORBA LINDA CA 92886 Permit Applicant MICHAEL DIXON { i l i 1 Type ElectricatFixtures '' Qty ' Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Receptacle, switches, lights, • j 1 ; J + ' ;40! "Shower 1 Ventilation Fan - — 300 cfm on single duct 2 f Lavatory 1 4 Water Closet 1 e • Kitchen Sink 1 t •', �."Vyr •1 Garbage Disposal 1 •""-'" ` �.e - ` Repair/ rain Alteration/Vent Piping 1 Dishwasher 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo City of Anaheim P�PHEIM CqC O� �o Building Division F i u ' �DUNDED �8y^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION F DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the folWng applicable items have been sinneds Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildin Ins', ANN -EXPIRED Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders)5r C 0 Al Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) _ _ 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned: E. W 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Rough Plumbing (Top Out) Or _ Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath° Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Strutt., Ele., or Mec.) Grease Interceptor (Do not backfill tjnlpsq -waned off) Sewer Water Engineering Backflow (Testable Only) Water Service