Loading...
745 W KATELLA AVE (132)Permit Types BLD ELE MEC PLM X Permit Number: BLD2023-00475 Issued: 01/30/2023 www.anaheim.net/building (714)765-0626 Quarter Section: 76 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765-5153 Site Address: 745 W KATELLA AVE 808, Anaheim, CA 92802 Legal Description: S TWP 4 RGE.10 SEC 22 T4S RI OW SEC 22 POR OF SW1A APN:08228043 Project Description: DCA - Electrical to install (2) light fixtures Living Area: Number of Stories: t Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinldered: Cool Roof: Total Fees paid for Permit: 836.00 People Associated with Project: Contractor MORROW - MEADOWS CORPORATION 231 BENTON COURT CITY OF INDUSTRY, CA 91789 Owner FIRST AMERICAN TRUST FSB TR MILDRED MA PO BOX 5046 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Receptacle, switches, lights 2 The permit shall expire by [Imitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�PNEIM Cq< City of Anaheim o� io Building Division i u D �o�ro0 0% Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been s' e • Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sionedo 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Strutt., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service