Loading...
2544 E LIZBETH AVEPermit Types BLD ELE MEC PLM X Permit Number: BLD2023-03109 Issued: 06/22/2023 www.anaheim.net/building (714)765-0626 Quarter Section: 124 Site Address: 2544 E LIZBETH AVE, Anaheim, CA 92806 Legal Description: N TR 4425 BLK LOT 14 APN:25336408 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (71417 7-5 Project Description: Re -roof. tear -off existing and install (30) sq. of composition shingles and OSB on house and attached garage. Living Area: Number of Stories: 1 Valuation: 18,000.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinldered: Cool Roof: Total Fees paid for permit: 340.34 People Associated with Project: Contractor G M - E T ROOFING REMOVAL AND CONSTR 130112 47TH ST201001051348176040 NEWPORT BEACH, CA 92663 Permit Applicant Gregory Mcdonald Owner MAYERNICK, MICHAEL 8 ROBIN 2544 E LIZBETH AVE Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The penult shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. City of Anaheim Building Division Do not occupy this building until the final inspections have been made. INSPECTION DATE INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground ElectrodelUfer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been si Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been Mona& 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) . Masonry (Reinf./Bond Beam/Pre-Grout) - Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor -11 unless Moned ofl) Sewer Water Engineering Backflow (Testable Only) Water Service FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765-4591 Sub LIsVBus. Lic. (714) 765-5194 (Allow 10 business days) COA/Migation Measures Building Final (714 765-5153): Last Inspection -Final Only After Above Completed PARTIAL INSPECTIONS Building Inspections Mechanical Inspections Plumbing Inspections Electrical Inspections