Loading...
3191 E LA PALMA AVE (8)Permit Types BLD ELE MEC PLM X Permit Number: BLD2018-05245 Issued: 02/07/2019 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 140 Site Address: 3191 E LA PALMA AVE BLDG. 251 Legal Description: KRAEMER TR BLK K LOT 15 POR LOT 200 St--AkA-HEIM4L (714) 765 - 5153• EIM Project Description: Tenant Improvement: Install (15) new skylights, (5) openings for garage doors, and 4,752 sq ft of wood siding. Install siloh on new foundation pad. Construct accesibility ramp and pathway. All core and shell modifications only for "Brewery X". Number of Stories 1 Valuation: $35,000.00 Construcion Types: IIB, , Fire Sprinklered? Yes Cool Roof No Total Fees paid for Permit: 7,332.80 People Associated with Project: Owner CALCO LLC 3191 E LA PALMA AVE ANAHEIM CA 92806-2803 Engineer SCOTT D ARMSTRONG 41870 KALMIA ST STE 165 MURRIETA CA 92562 Engineer OCTAVIAN VLAGEA 6771 WARNER BLVD STE 3988 HUNTINGTON BEACH CA 92647 Engineer CHRISTOPHER L KOCH,. . 4651 SCENARIO DR HUNTINGTON BEACH CA 92649 Permit Applicant SCOTT PENNNGTON IN a r Type Electrical Fixtures `Qty-.- Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty J s' The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit combo P�POEIM Cq< City of Anaheim o� �o Building Division ? > �O�NOEO %$y1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test ` Electrical Final Plumbing Final 2 G r Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) A,% Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub ListlBus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned: Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) E G T 1 n ni Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been smaned. 1st Floor Shear - Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy)— Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service