Loading...
941 E MASON LN (5)Permit Types BLD ELE MEC PLM X X Permit Number: BLD2017-05502 Issued: 12/08/2017 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 107 Site Address: 941 E MASON LN (TEMP. POWER) Legal'Description: C '200 S A1�AHEIM4LVD. (714) 765 - 5153 EIM Project Description: Miscellaneous: 1,440 s.f. sales trailer with accessibly compliant restroom for "LEWIS STREET TOWNHOMES." REF: BLD2017-04167 Number of Stories 1 Valuation: $15,000.00 Construcion Types: VB. , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 612.22 People Associated with Project: Engineer RAYMON GERGES THREE HUGHES IRVINE CA 92618 Engineer KEVIN C DAY 12808 SOUTH 600 EAST DARPER UT 84020 Engineer -�HUAN NGUYENA ' "'' 4400 CAMPUS DR. NEWPORT BEACH CA 92660 Engineer VETTE M WIL'SO � ° ' �I 1100 MAIN STREET SUITE A WATSONVILLE CA 95076 Engineer BRIAN R,OVERL pYq , j 25635 CALLE LA FUENTE SAN JUAN CAPISTRANO CA 92675 Contractor RK CONSTRUCTION SERVICES INC 3001 BISHOP DR 100 SAN RAMON CA 94583 Permit Applicant,-,JRUMA LAN BAIRD i�l J j �� Type t� EleJctrir al Fixtured Qty: �Typ�e p Plumbing Fixtures Qry Type Mechanical Fixtures Qty o _ _ Water Main per 100 ft. 1 Sewer per 100 ft. 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbid_permit_combo City of Anaheim Building Division Do not occuov this buildinq until the final insaections have been made. INSPECTION I DATE IINSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) / Electrical Ground ElectrodelUfer Setback/Forms/Trenches (Footings) IT Do not install subfloor or pour floor slab until the follwing applicable items fiave been Plumbing (Ground/Underfloor Underfloor Rouqh Gas FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765-4591 Sub LIst/Bus. Lic. (714) 765-5194 (Allow 10 business days) OAIMination Measures ding Final (714 765-5163) Inspection -Final Only After Above Completed PARTIAL INSPECTIONS Electrical (Underground Conduit) Buildinci Ins ePU� M I T EXPIRED Pre -slab (Compaction/Membrane Reinf.) Floor (JolstlGlyders) I NIS p E (� N Underfloor Insulation (Raised Foundation Only) �-I n �-F�v� Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have st Floor Shear Dept.) Floor Shear Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Penetrations (Ele, Mec & Plbg) Lath Lath U Service Meter -(Meter will be set within 2-3 days after approval) Excludes New Exterior Plaster (Brown Coa T -Bar (Strutt., Ele., or Mec.) Sewer Service Backflow (Testable Only) Mechanical Inspections Plumbing Inspections Electrical Inspections