Loading...
3000 E MIRALOMA AVEPermit Types BLD ELE MEC PLM X Permit Number: OLD2023-02763 Issued: 06/05/2023 www.anaheim.net/building (714)7654626 Quarter Section: 131 Nkfile] S_1i1_1a14111] Site Address: 3000 E MIRALOMA AVE, ANAHEIM, CA 92806 Legal Description: P BK 124 PG 23 PAR 8 APN:34434204 BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765.5153 Project Description: Reroof: To remove existing and install (75) sq. of over fiat roof TPO over the entire building Living Area: Number of Stories: 1 Valuation: 44,000.00 Garage Area: Constriction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinldered: Cool Roof: Total Fess paid for Permit: 462.32 People Associated with Project: Contractor BUILT - RITE CONSTRUCTION INC 10301 SO SAN PEDRO STREETABCDE11121291 LOS ANGELES, CA 90003 Permit Applicant Kevin Atkiuson Owner PEIFFER, TERRY T TR 4402 PROSPECT AVE Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�pNElm Cq< Cityof Anaheim D� io Building Division F z U a �DUNDED � Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 766-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been signed: Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INS PECTI NS AI in In actions / Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane ReinC) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) — Do not cover or conceal the work below until the following applicable items he beensinned: - V 1st Floor Shear CT Firesprinkler (Rough) (Fire Dept.) Mechanical Ins tions Ql r,l S� V s hkf� 2' OO 2nd Floor Shear (Sheathin ph rag m/Frame) sonry(Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service