Loading...
211 E NORTH STProject Description: (ADU) Residential Addition: Construct 484 s.f. accessory dwelling unit detached 1 -bedroom studio with kitchen, bathroom and living room. Living Area: 484 Valuation: $50,00 .00 Construcion Types: VB, , Occupancy Groups: R3, , , , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 3,458.86 People Associated with Project: Owner EUGENIO SOLORIO 211 E NORTH ST ANAHEIM CA 92805-1920 Engineer FERNANDO MEJIA 8305 DUCOR AVE WEST HILLS CA 91304 Permit Applicant JUAN SOLORIO 211 E NORTH ST ANAHEIM CA Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty New or total rewire -1 or 2 family 484 Bath Tub 1 Compressor/Boiler - up to 15 hp 1 Meter/Disc Sw - under 600 V, up to 200 1 Lavatory 1 Heating/Cooling Coil 1 amps Water Closet 1 Ventilation Fan - <= 300 cfm on single duct 2 Kitchen Sink 1 Garbage Disposal 1 Repair/Drainage Alteration/Vent Piping 1 Water Heater 1 't Gas System (1-5 outlets) 1 Sewer per 100 ft. 1 The permit shall expire by limitation and become'null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work, fbld_permit combo Cq< City of Anaheim P�PVAEIM i o� o Building Division h i U > �CGNUE0 8y1 Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR . All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed7 Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildina Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) r Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) U' Do not cover or conceal the work below until the following applicable items have been s' R. 1st Floor Shear d i9 tf2k., Firesprinkler (Rough) (Fire Dept.) Mechanical In a Cti T EXP IRED 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) UV M Rough Duct (Mechanical) Rough Mechanical DAT 2 2 Rough Electrical /q G Rough COA/Mitagation Measures Plumbina Inspections Framing (Only after Plbg.. Ele., Mec. & Fire) -H Insulation (Sound/Energy) S 3 / J G Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) OA Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Strutt., Ele., or Mec.) Grease Interceptor f Do not backfill unless sinnpd nfn Sewer Water Engineering Backflow (Testable Only) Water Service Permit Types BLD ELE MEC PLM A. X X X X Permit Number: BLD2018-01892 Issued: 10/25/2018 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 82 Site Address: 211 E NORTH ST B Legal. Description: N TR 304 BLK 2 LOT 9 CI 200 VANAHEI BLVD. (714) 765 - 5153 EIM Project Description: (ADU) Residential Addition: Construct 484 s.f. accessory dwelling unit detached 1 -bedroom studio with kitchen, bathroom and living room. Living Area: 484 Dwelling Units: 1 Valuation: $50,000.00 Construcion Types: VB, , Occupancy Groups: R3, , , , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 5,635.86 Associated Owner EUGENIO SOLO_RIO i f� �- 211 E NORTH ST ANAHEIM CA 92805-1920 Engineer FERNANDO MEJIA4 ... n I 8305 DUCOR AVE WEST HILLS CA 91304 Permit Applicant JUAN'SOLORIO, f� 211 E NORTH ST ANAHEIM CA Type Electrical Fixtures I I t' I '"� ,-Qty Type's; Plumbing Fixtures Qty New or total rewire -1 or 2 family 484 Bath Tub 1 Meter/Disc Sw -under 600 V, up to 200 _. -. .--._2 `~Lavatory 1 amps Water Closet 1 Sub Panel/Temp Pwr - < 600 V, 0 < amps 1 Kitchen Sink 1 <= 200 ::.... --_... . Garbage Disposal 1 Repair/Drainage Alteration/Vent Piping 1 Water Heater 1 Gas System (1-5 outlets) 1 Sewer per 100 ft. 1 Type Mechanical Fixtures Qty Compressor/Boiler - up to 15 hp 1 Heating/Cooling Coil 1 Ventilation Fan - <= 300 dm on single duct 2 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbidjermit_combo �PHEIM cq r Cityof Anaheim D� P <�O Building Division F i U > �D�nrDED % Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR .?..All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sffianed7 Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas pR ®��j-Ii1��IN����R E D Buildinq Inspe l sg `��YY I N S P E C T I O N Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) DATE: Do not cover or conceal the work below until the following applicable items have been smaned7 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fine) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Strutt., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service