214 S OWENS DR (6)Permit Types BLD ELE MEC PLM X I X X X Permit Number: BLD2017-04729 Issued: 12/20/2017 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 202 Site Address: 214 S OWENS DR Legal Description: P BK 105 PG 20 PAR 2 C 200 S'SA 1�G1_ H_EIMABLVD. (714) 765 - 5153 Project Description: Residential Addition: 67 sq.ft. extension of existing kitchen for primary dwelling unit. EIM Living Area: 67 Valuation: $28,000.00 Construcion Types: VB, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 1,097.59 People Associated with Project: Owner MARQUIMARY PIN ROTHMAN 2400 E KATELLA AVE #320 ANAHEIM CA 92806-5969 Engineer HAROLD PING HUNG WU 1168 SAN GABRIEL BLVD ROSEMEAD CA 91770 Contractor INNER CITY SKYLINE INC 419 MAIN ST 36 HUNTINGTON BEACH CA 92648 Permit Applicant EMMA LESS Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Receptacle, switches, lights 20 Kitchen Sink 1 Ventilation Fan - <= 300 cfm on single duct 1 Garbage Disposal 1 Dishwasher 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo - { P�PNEIM �qt •• Cityof Anaheim o� �o Building Division ; i y DED � Do not occupy this building untilthe. final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMlgation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been si ned• Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the.work below until the following applicable items have been sinned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Pibg) ` Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction - Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor 0 not backfill unless sioned off) Sewer Water Engineering Backflow (Testable Only) Water Service