214 S OWENS DR (6)Permit Types
BLD ELE MEC PLM
X I X X X
Permit Number: BLD2017-04729
Issued: 12/20/2017
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 202
Site Address: 214 S OWENS DR
Legal Description: P BK 105 PG 20 PAR 2
C
200 S'SA 1�G1_ H_EIMABLVD.
(714) 765 - 5153
Project Description: Residential Addition: 67 sq.ft. extension of existing kitchen for primary dwelling unit.
EIM
Living Area: 67 Valuation: $28,000.00
Construcion Types: VB, ,
Fire Sprinklered? No
Cool Roof No
Total Fees paid for Permit: 1,097.59
People Associated with Project:
Owner MARQUIMARY PIN ROTHMAN 2400 E KATELLA AVE #320 ANAHEIM CA 92806-5969
Engineer HAROLD PING HUNG WU 1168 SAN GABRIEL BLVD ROSEMEAD CA 91770
Contractor INNER CITY SKYLINE INC 419 MAIN ST 36 HUNTINGTON BEACH CA 92648
Permit Applicant EMMA LESS
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Receptacle, switches, lights 20 Kitchen Sink 1 Ventilation Fan - <= 300 cfm on single duct 1
Garbage Disposal 1
Dishwasher 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit_combo
- { P�PNEIM �qt ••
Cityof Anaheim o� �o
Building Division ; i
y DED �
Do not occupy this building untilthe. final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMlgation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
si ned•
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the.work below until the following applicable items have
been sinned:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Pibg)
`
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction -
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
0 not backfill unless sioned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service