Loading...
926 S PARK CIRPermit Types BLD ELE MEC FLM X Permit Number. OLD2023-02660 Issued: 05/31/2023 www.anaheim.net/building (714)7654626 Quarter Section: 48 She Address: 926 S PARK CIR 1-8, Anaheim, CA 92804 Legal Doscdptlon: +N TR 3266 BLK'LOT 29 APN: 12829116 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 -5153 Project Description: Reroof: To remove and install (1550) sq. of torch down over flat roof of carports of apartment building LMng Area: Number of Stories: 1 Valuation: 11,000.00 Garage Area: Construction Types: NIA Carport Ares: Occupancy Groups: Balcony I Deck Area: Fire SprinNered: Cool Roof: Total Fees paid for Perron: 342.08 People Associated with Project: Contractor MCCARTHY ROOFING 625 WEST KATELLA AVE 029201905140819378210 ORANGE, CA 92867 Permit Applicant Cesar Ferman Owner COEG-CA LLC 1301 ARROYO LINDO DR Type Electrical Fixtures My Type Plumbing Fixtures Oty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�PHEIM Cq< City of Anaheim of �o Building Division i u > DED day^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/MiggW Measures Do not install subiloor or pour floor slab until the follwing applicable items have been sinned: ilding Final 714 765-5153) FPO Ins ect anal Only After Above Competed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas 5 PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned* 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd r oof Sheathing) iaphragm/Frame) Z— elnf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Strutt., Ele., or Mec.) Grease Interceptor (nn not hackfill ijnlpqq Sewer Water Engineering Backflow (Testable Only) Water Service