2480 W PALAIS RD (3)City of Anaheim InspeceonsM
1. AN plumbing to be completed and the system pressurized to 35 lbs. with water
BUILDING DIVISION or house pressure.
2. All metal within 5 feet of pool water, and all pool equipmeK must be bonded
INSPECTION RECORD to pool reinforcing steel with 96 solid copper wire. Niche light shell, deck Inserts,
etc. shall be bonded to pool rebar.
SWIMMING POOL 3. Pool equipment is not required to be set at this time.
Inspections 0.10:
ADDRESS: 2480 W PALAIS RD, ANAHEIM, CA 92804 1. Underground electric Inspected prior to bagdilling.
OWNER: SHURDIM OLIVER MATT 2. Gas line test at 109 for 15 minutes with 159 gauge.
9. When polyethylene gas piping Is used, a certificate from a certified Installer
PERMIT M SWI2022-00141 and tracer wire shall be provided per CPC 1210.1.7.2 APPENDIX I.
DATE ISSUED: 01/09/2023
DESCRIPTION: New Swimming PooySpa: 400 sq. ft. gunite pool and
48 sq. fl. spa.
POST THIS CARD WITH THE APPROVED PLANS
IN A CONSPICUOUS PLACE ON THE JOB SITE
nspection CodeWfor
in 504
onding 506
. 508
FBLD-4teel
l to Gunite 510
DO NOT GIINITE POOLISPA
until all the above inspections have been signed.
el and Electric botures,Slides Etc)
508
DO NOT GUNITE ROCK STRUCTURE
(water feature, rock slide, fountain, waterfall, grotto etc.) until the above Inspection has
been signed.
6: Underground Electric
512
7. Gas Piping Test
514411�+
8. P -Trap Receptor
516
9. Baddlow
518
10. Dedc, Deck Drains,
Equipotential & Accessory
Bondina
520
DO NOT POUR FLATWORK
until all the above Inspections have been signed.
11. Rough Electrical 522
12. Fencing/Door Alarms 524 11112bi MA
13. Plaster approval 526
DO NOT PLASTER
until all the above Inspections have been signs .
14. Final Electric 528
c
Sub -Contractors List MUST be approved and pool cover on site
PRIOR to Pool Final Inspection request
FINAL INSPECTION CODE DATE INSPECTOR
15. Rough Demo 527
16. Final 599 ^
MISC. INSPECTIONS Date Inspector
fbldjobcards
Inspections 11.13:
1. Rough electric inspection when all wiring Is completed and ready prior to the
plastering of poollspe. Potting compound In place at plastic fight niche.
2. Current Code requires that any pact, spa or water feature
contacting water 18 inches or more in depth shall be enclosed by a barrier
adequate to prevent entry of small children. The border shall comply with
Section 3109 of current CBC and CRC APPDENDIX V specifying the height of
any fence provided as barrier to the pool &- shall be 60- above grade on the
outside of the fence.
3. Doom from a garage shell meet the requirements for a gate. Glass
windows within 5' of pool water shall be tempered glass.
4. Prior to pro -piaster Inspection, streets, curbs and city sidewalks will be
Inspected for any damage due to conshidion of pool or spas.
5. Grading complete with positive drainage to street or public way. All
exposed plastic pipe shag be painted to protect from sunlight.
Inspections 14.10:
1. Gas and Electrical completely removed and 2x2 holes at bottom of pool
and/or Isolated elements.
2. Pool backfilled:
A.) With future build - se0ecompacting sand 95% with recelpt.
B.) No future build - any NI.
3. After pool is operating and In working condition with approved pool cover on
site.
INSPECTION REQUESTS
Inspection requests made prior to 5:00 pm Monday - Friday
will be scheduled on the following workday.
To schedule your building Inspection online, please go to
https:llaca.anaheim.net/CitizenAccess
Inspection can normally be reached between
7:30 - 8:00 A.M.
(714)765.5153 + 0
To access your Inspection timeframe:
Please go to www.anaheim.netlbuilding after P30am on the day of your
Inspection. Under Online Services, dick on the link'Inspection
Timeframes' or tail (714) 765.5153 + 0