2480 W PALAIS RD (3)City of Anaheim InspeceonsM 1. AN plumbing to be completed and the system pressurized to 35 lbs. with water BUILDING DIVISION or house pressure. 2. All metal within 5 feet of pool water, and all pool equipmeK must be bonded INSPECTION RECORD to pool reinforcing steel with 96 solid copper wire. Niche light shell, deck Inserts, etc. shall be bonded to pool rebar. SWIMMING POOL 3. Pool equipment is not required to be set at this time. Inspections 0.10: ADDRESS: 2480 W PALAIS RD, ANAHEIM, CA 92804 1. Underground electric Inspected prior to bagdilling. OWNER: SHURDIM OLIVER MATT 2. Gas line test at 109 for 15 minutes with 159 gauge. 9. When polyethylene gas piping Is used, a certificate from a certified Installer PERMIT M SWI2022-00141 and tracer wire shall be provided per CPC 1210.1.7.2 APPENDIX I. DATE ISSUED: 01/09/2023 DESCRIPTION: New Swimming PooySpa: 400 sq. ft. gunite pool and 48 sq. fl. spa. POST THIS CARD WITH THE APPROVED PLANS IN A CONSPICUOUS PLACE ON THE JOB SITE nspection CodeWfor in 504 onding 506 . 508 FBLD-4teel l to Gunite 510 DO NOT GIINITE POOLISPA until all the above inspections have been signed. el and Electric botures,Slides Etc) 508 DO NOT GUNITE ROCK STRUCTURE (water feature, rock slide, fountain, waterfall, grotto etc.) until the above Inspection has been signed. 6: Underground Electric 512 7. Gas Piping Test 514411�+ 8. P -Trap Receptor 516 9. Baddlow 518 10. Dedc, Deck Drains, Equipotential & Accessory Bondina 520 DO NOT POUR FLATWORK until all the above Inspections have been signed. 11. Rough Electrical 522 12. Fencing/Door Alarms 524 11112bi MA 13. Plaster approval 526 DO NOT PLASTER until all the above Inspections have been signs . 14. Final Electric 528 c Sub -Contractors List MUST be approved and pool cover on site PRIOR to Pool Final Inspection request FINAL INSPECTION CODE DATE INSPECTOR 15. Rough Demo 527 16. Final 599 ^ MISC. INSPECTIONS Date Inspector fbldjobcards Inspections 11.13: 1. Rough electric inspection when all wiring Is completed and ready prior to the plastering of poollspe. Potting compound In place at plastic fight niche. 2. Current Code requires that any pact, spa or water feature contacting water 18 inches or more in depth shall be enclosed by a barrier adequate to prevent entry of small children. The border shall comply with Section 3109 of current CBC and CRC APPDENDIX V specifying the height of any fence provided as barrier to the pool &- shall be 60- above grade on the outside of the fence. 3. Doom from a garage shell meet the requirements for a gate. Glass windows within 5' of pool water shall be tempered glass. 4. Prior to pro -piaster Inspection, streets, curbs and city sidewalks will be Inspected for any damage due to conshidion of pool or spas. 5. Grading complete with positive drainage to street or public way. All exposed plastic pipe shag be painted to protect from sunlight. Inspections 14.10: 1. Gas and Electrical completely removed and 2x2 holes at bottom of pool and/or Isolated elements. 2. Pool backfilled: A.) With future build - se0ecompacting sand 95% with recelpt. B.) No future build - any NI. 3. After pool is operating and In working condition with approved pool cover on site. INSPECTION REQUESTS Inspection requests made prior to 5:00 pm Monday - Friday will be scheduled on the following workday. To schedule your building Inspection online, please go to https:llaca.anaheim.net/CitizenAccess Inspection can normally be reached between 7:30 - 8:00 A.M. (714)765.5153 + 0 To access your Inspection timeframe: Please go to www.anaheim.netlbuilding after P30am on the day of your Inspection. Under Online Services, dick on the link'Inspection Timeframes' or tail (714) 765.5153 + 0