Loading...
1616 E TURIN AVEPermit Types BLD ELE MEC PLM X Permit Number: BLD2623-02941 Issued: 06/13/2023 www.anaheim.net/building (714)765-0626 Quarter Section: 105 Site Address: 1616 E TURIN AVE, ANAHEIM, CA 92805 Legal Description: N TR 6409 BLK LOT 84 APN:23405405 CITY OF ANAHEIM Project Description: Residential EV Charger level 2 in garage. ' Living Area: Number of Stories: Garage Area: Carport Area: Balcony / Deck Area: Cool Roof: BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765.5153 1 Valuadon: 0.00 Consbucdon Types: N/A Occupancy Groups: Fire Spfinldered: Total Fees paid for Permit: 167.00 People Associated with Project: Permit Applicant Sergio SaivadorSandoval 1616 E Turin Ave Anaheim, CA 92805 Owner SANDOVAL SERGIO SALVADOR 1616 E TURIN AVE Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. City of Anaheim Building Division Do not occupy this building until the final inspections have been made. INSPECTION I DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been signed: Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisNGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765-4591 Sub LIsVBus. Lic. (714) 765-5194 (Allow 10 business days) COAIMigation Measures Building Final (714 765-5153) Last Inspection -Final Only After Above Completed 'L PARTIAL INSPECTIONS Building Inspections Mechanical Inspections Plumbing Inspections Electrical Inspections