2340 W VALDINA AVE (2)Permit Types
BLD ELE MEC PLM
X
Permit Number: OLD2022-04938
Issued: 10/18/2022
www.anaheim.net/building
(714)765-4626
Quarter Sectinn• 31
Site Address: 2340 W VALDINA AVE, Anaheim, CA 92801
Legal Description: N TR 1161 BLK LOT 76
AFN:07114301
CITY OF ANAHEIM
BUILDING DIVISION
200 S: ANAHEIM BLVD.
(7141765.5153
Project Description: Mechanical and Plumbing to Replace air conditioner, furnace, and water heater
Living Area: Number of Stories: 0 Valuation: 0.00
Garage Area: Construction Types: NIA
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Spdnidered:
Cool Roof: Total Fees paid for Penult: 213.00
People Associated with Project:
Permit Applicant Desiree Clayton
Owner SMITH DAVID E 8 THELMA E 2340 W VALDINA AVE
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Evaporative or Air Cooled Condenser 1
Heating Appliances, including vent 1
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
City of Anaheim
Building Division
Do not occupy this building until the final inspections have been made.
INSPECTION I DATE INSPECTOF
Do not pour concrete until the following applicable items have been signed:
lumbing (Ground/Underfloor Drain Waste)
lectrical Ground Electrode/Ufer
or pour
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until
FINAL INSPECTIONS I DATE I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
all It622 7aechanical
Final e2_ 22.
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
t Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765-4591
Sub UsUBus. Lic. (714) 765-5194 (Allow 10 business days)
COA/Migation Measures
n
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Building Inspections
PARTIAL INSPECTIONS
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service