Loading...
2340 W VALDINA AVE (2)Permit Types BLD ELE MEC PLM X Permit Number: OLD2022-04938 Issued: 10/18/2022 www.anaheim.net/building (714)765-4626 Quarter Sectinn• 31 Site Address: 2340 W VALDINA AVE, Anaheim, CA 92801 Legal Description: N TR 1161 BLK LOT 76 AFN:07114301 CITY OF ANAHEIM BUILDING DIVISION 200 S: ANAHEIM BLVD. (7141765.5153 Project Description: Mechanical and Plumbing to Replace air conditioner, furnace, and water heater Living Area: Number of Stories: 0 Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spdnidered: Cool Roof: Total Fees paid for Penult: 213.00 People Associated with Project: Permit Applicant Desiree Clayton Owner SMITH DAVID E 8 THELMA E 2340 W VALDINA AVE Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Evaporative or Air Cooled Condenser 1 Heating Appliances, including vent 1 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. City of Anaheim Building Division Do not occupy this building until the final inspections have been made. INSPECTION I DATE INSPECTOF Do not pour concrete until the following applicable items have been signed: lumbing (Ground/Underfloor Drain Waste) lectrical Ground Electrode/Ufer or pour Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final all It622 7aechanical Final e2_ 22. Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 t Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765-4591 Sub UsUBus. Lic. (714) 765-5194 (Allow 10 business days) COA/Migation Measures n Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Building Inspections PARTIAL INSPECTIONS 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service