Loading...
130 S DELANO STPermit Types BLC>ELE MEC PLM X X X L-tlPermitNumber:BLD2020-04660 Issued:03/08/2021 i.-● CITYiOIO^ftHEIM BUILDING DIVISION 200 S.ANAHEIM BLVD. INSPECTION REQUEST LINE; (714)765 -4626 Quarter Section;9 {714)765-5153 Site Address:130 S DELANO ST Legal Description:N TR 4230 LOT 25 Project Description:Repair:Replace damaged beam and stud wall at garage's #2 and 3,450 sq ft of drywall,damaged electrical and water heaters.REF 1NV2020-00326 $15,000.00 VB,, Valuation: Construcion Types: Fire Sprinklered? Total Fees paid for Permit: No 1,826.95 People Associated with Project: P O BOX 4105 DOWNEY CA 90241-1105 180 MAIN ST STE 201 TUSTIN CA 92780 11779 CARDINAL CIR GARDEN GROVE CA 92843 0000 BOB C HAMMON TROwner HANS C HANSEN ROBERT'S CONSTRUCTION Engineer Contractor QtyMechanicalFixturesQtyTypePlumbingFixturesQtyTypeElectricalFixturesType 210WaterHeaterReceptacle,switches,lights The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work.fbld_permit_combo DATE INSEECTOR1— All applicable items below must be signed Defore uilllUes arts raleasgU FINAL INSPECTIONSCityofAnaheim Building Division Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have boon made Engineering Final (714)765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041 Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591 Electrical Ground Electrode/Ufer Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings)COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been saasd. Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork)PARTIAL INSPECTIONS Building lnspectionPER{\/||y EXPIRED INSPECTION— NOT COMPLETED Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) dttte:72ndFloor(Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed: 1st Floor Shear Firesprinkler (Rough)(Fire Dept.)Mechanical Inspections 2nd Floor Shear Roof (Sheathlng/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg,,Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meterwill be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor i-,t ['ir-Hill in'.-.Jill Sewer Water Engineering Backflow (Testable Only) Water Service