Loading...
203 S GILBERT STPermit Types CITY OF ANAHEIMPLMELEMECBLD X BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765-5153 Permit Number:BLD2022-02932 Issued:06/29/2022 www.anaheim.net/building (714)765-4626 Quarter Section;33 Site Address:203 S GILBERT ST,ANAHEIM,CA 92804 Legal Description:N TR 1940 BLK LOT 72 APN:12704421 Project Description:Re-roof;tear of existing material,re-sheath as necessary,and install (30)squares of composition shingles. 1 17,000,00LivingArea: Garage Area: Carport Area: Balcony /Deck Area: Cool Roof: Number of Stories:Valuation: Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: N/A 341.21 People Associated with Project: 7171 SYRACUSE AVE STANTON,CA 90680Contractor Permit Applicant Owner NHAT TRAN Viet HPham NGUYEN STEVE &TIFFANY 203 S GILBERT ST Qty Type Plumbing Fixtures Qty Mechanical Fixtures QtyTypeElectricalFixtures The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit Is required to commence or continue work. FINAL INSPECTIONS DATE INSPECTOR City of Anaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041 Do not pour concrete until the follovwng applicable items have been signed:Fire Dept.Final (714)765-5041 Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591 Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer Setback/FormsH'renches (Footings)COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been siuiied Building Final (714 765-5153) Last Inspection-Final Only After Above Completed 7 .F-22 l^x <â– Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed: 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after PIbg.,Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed; Drywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Constmclion Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor iPn not sinnnd ('Hi Sewer Water Engineering Backflow (Testable Only) Water Service