Loading...
1152 S. POSITANO AVEPermit Types CITY OF ANAHEIMPLMBLD,ELE MEC X BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765-5153 Permit Number:BLD2023-04745 Issued:09/13/2023 www.anaheim.net/building (714)765-4626 Quarter Section:221 Site Address:1152 S POSITANO AVE,ANAHEIM.CA 92808 Legal Description:N TR 12697 BLK LOT 7 UN 140 TRACT 12697,LOT 7 OF APN:93044550 Project Description:Residential EV Charger Level 2 0.00Valuation:Living Area: Garage Area: Carport Area: Balcony /Deck Area: Cool Roof: Number of Stories: Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit:0.00 People Associated with Project: 180 N.ROSE BLOSSOM LANE ANAHEIM,CA 92807Contractor Permit Applicant C2 ELECTRIC Zoltan Csernus Qty.Type Qty Mechanical Fixtures QtyTypeElectricalFixturesPlumbingFixtures 1EVCharger The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work. DATE INSPECTORFINALINSPECTIONS City of Anaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041INSPECTION Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Water Engineering (714)765-4591Plumbing(Ground/Underfloor Drain Waste) Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer COA/Migation MeasuresSetback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the foilwing applicable items have been signed:^ Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed: 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after PIbg..Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywail Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(MeterwiII be set within 2-3 business days after approval)Excludes New Construction Exterior Piaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor iHn not backfill unless siGnrd off) Sewer Water Engineering Backflow (Testable Only) Water Service PRODUCT OVERVIEW This manual applies to Wall Connectors identified by part number 1457768-**-*. Product Specifications Nominal 200-240 V AC single-phase 12 -48 amps 12-4 AWG (3.5 -25 mm^).copper only W (21 mm)default,1"(27 mm)optional TN/TT 50/60 Hz 8.5'(2.6 m)or 18’(5.5 m) Voltage and Wiring Current Output Range Terminal Blocks Supported Conduit Sizing Grounding Scheme Frequency Cable Length Wall Connector Dimensions Height;13.6”(345 mm) Width:6.1”(155 mm) Depth;4.3”(110 mm) Wire Box Bracket Dimensions Height:9.8”(250 mm) Width;4.7”(120 mm) Depth:2.0”(50 mm) 10 lb.(4.5 kg) -22"F to 122“F (-30°C to SOX) -40"F to 185°F (-40X to 85X) Type 3R Weight (including wirebox) Operating Temperature Storage Temperature Enclosure Rating Ventilation Not required Externa!branch circuit breakerMeansofDisconnect Integrated,no additional required (CCID20) 2.4 GHz,802.11b/g/n cULus -E351001 Ground Fault Circuit Interrupter Wi-Fi Agency Approvals Transportation and storage:Ensure that Wall Connector is within storage temperature when moving transporting,or storing. This device complies with part 15 of the FCC Rules.Operation is subject to the following conditions:(1) This device may not cause harmful interference,and (2)this device must accept any interference received,including interference that may cause undesired operation. 4 Gen 3 Wall Connector Manual