Loading...
4812 E. WOODWIND WAYPermit Types CITY OF ANAHEIMPLMBLDELEMEC X BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765-5153 Permit Number:BLD2023-06476 Issued:12/06/2023 www.anaheim.net/building {714)765-1626 Quarter Section:171 Site Address:4812 E WOODWIND WAY,ANAHEIM,CA 92807 Legal Description:N TR 5989 BLK LOT 34 APN:34307104 Project Description:Patio Cover:264 sq ft to construct attached enclosed patio with electrical 20,000.000Valuation;Number of Stories:Living Area: Garage Area: Carport Area: Balcony /Deck Area: Cool Roof: N/AConstructionTypes: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit:669.60 People Associated with Project:/ 5036 WOODLEY AVE200505261106105920 ENCINO,CA 91436Contractor Permit Applicant Owner CANOPY CONCEPTS INC Jeanelle Heaston GITTENS,ROSE 4812 WOODWIND WAY Mechanical Fixtures QlyQtyQtyTypePlumbingFixturesElectricalFixturesType he permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the ate of permit issuance.A new permit is required to commence or continue work. DATE INSPECTORFINALINSPECTIONS City of Anaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test XElectricalFinal Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041 Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591 Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer COA/Migation MeasuresSetback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the foilwing applicable items have been j^ioned Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building Inspections iElectrical(Underground Conduit) Pre-slab {Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed: 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after Plbg.,Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &Plbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor 11 >n nr.t h^ir.kfill unless sKinn'l of! Sewer Water Engineering Backflow (Testable Only) Water Service