Loading...
1080 S. DOVER CIRPermit Types MEC PLMBLDELE X Permit Number:BLD2020-05425 issued:12/16/2020 CITY OF ANAHEIM INSPECTION REQUEST LINE: (714)765-4626 Quarter Section:105 BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765-5153 Site Address:1080 S DOVER CIR Legal Description:N TR6812 LOT 30 Project Description:Reroof:Tear off existing materiai,resheath as necessary,install 25 square of composition shingles over house and detached garage. $20,000.00 N/A,. 341.60 Valuation: Conslrucion Types: Total Fees paid for Permit: People Associated with Project: TRINH DUY NGUYEN 1080 S DOVER Cl ANAHEIM CA 92805-5747 13923 CRENSHAW BLVD HAWTHORNE CA 90250 Owner J B NEW CONSTRUCTION INC GERARDO DE LA ROSA Contractor Permit Applicant Qty Type Qty Type QtyElectricalFixturesPlumbingFixturesMechanicalFixturesType The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work.(bld_pcrmit_combo DATE INSPECTORFINALINSPECTIONS City of Anaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)76S-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041INSPECTION Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Water Engineering (714)765-4591Plumbing(Ground/Underfloor Drain Waste) Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer COA/Migation MeasuresSetback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the foilwing applicable items have been aumed Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) ^bRMIT FXPiPUnderfloorInsulation(Raised Foundation Only)r*' IN.SPFrj NOT COMP, Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed:, hate:-1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after Plbg.,Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &Plbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meterwill be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor (Do not biickfill iminfis signed offl Sewer Water Engineering Backflow (Testable Only) Water Service