1080 S. DOVER CIRPermit Types
MEC PLMBLDELE
X
Permit Number:BLD2020-05425
issued:12/16/2020 CITY OF ANAHEIM
INSPECTION REQUEST LINE:
(714)765-4626
Quarter Section:105
BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-5153
Site Address:1080 S DOVER CIR
Legal Description:N TR6812 LOT 30
Project Description:Reroof:Tear off existing materiai,resheath as necessary,install 25 square of composition shingles over
house and detached garage.
$20,000.00
N/A,.
341.60
Valuation:
Conslrucion Types:
Total Fees paid for Permit:
People Associated with Project:
TRINH DUY NGUYEN 1080 S DOVER Cl ANAHEIM CA 92805-5747
13923 CRENSHAW BLVD HAWTHORNE CA 90250
Owner
J B NEW CONSTRUCTION INC
GERARDO DE LA ROSA
Contractor
Permit Applicant
Qty Type Qty Type QtyElectricalFixturesPlumbingFixturesMechanicalFixturesType
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance.A new permit is required to commence or continue work.(bld_pcrmit_combo
DATE INSPECTORFINALINSPECTIONS
City of Anaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)76S-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041INSPECTION
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
Water Engineering (714)765-4591Plumbing(Ground/Underfloor Drain Waste)
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
COA/Migation MeasuresSetback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the foilwing applicable items have been
aumed Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONSMechanical(Groundwork)
Building InspectionsElectrical(Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
^bRMIT FXPiPUnderfloorInsulation(Raised Foundation Only)r*'
IN.SPFrj
NOT COMP,
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:,
hate:-1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after Plbg.,Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &Plbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meterwill be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
(Do not biickfill iminfis signed offl
Sewer
Water Engineering Backflow (Testable Only)
Water Service