Loading...
932 S. DOWNEY PL 932, 940, 948, 956Permit Types ELE MECBLD PLM y I / X /h ‘Permit Number:BLD2020-01878 Issued:05/27/2020 CITtYOFv^AHEIMA%●●/ INSPECTION REQUEST LINE: (714)765-4626 Quarter Section:34 BUILDING DIVISION 200S.-ANAHEjM BLVD. (714)765*5153 Site Address:932 S DOWNEY PL Legal Description:V Project Description:Reroof:Remove existing material,resheath as needed and install 34 squares of composition shingles on apartment building with units #932,940,948 &956. $28,672.00 N/A,. 365.73 Valuation: Constnjcion Types; Total Fees paid for Permit: People Associated with Project: Owner SUNNY INVEST LLC 932 S DOWNEY PL ANAHEIM CA 92804-4277 2484 N GLASSELL ST ORANGE CA 92865-0000JPCONTRACTORS,INC. MICHELLE VANDUSEN Contractor Permit Applicant Qty Type Qty TypeElectricalFixturesPlumbingFixtures Mechanical Fixtures QtyType The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work.fbld_permil_combo FINAL INSPECTIONS DATE INSPECTORCityofAnaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made,Engineering Final (714)765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041 Do not pour concrete until the following applicable items have been signed;Fire Dept.Final (714)765-5041 Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591 Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings)COA/Migation Measures Do not install subfloor or pour floor slab until the foilwing applicable items have been SKlIIOd.Building Final (714 765-5153) Last Inspection-Final Only After Above Completed 6 rPlumbing(Ground/Underfloor Water)y. Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been.signed: 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Flooji^fagar RooftSheathiri^/Diaphragm/Frame) Mason?y'(fi^nf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after PIbg.,Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor (Do not backfill unless signed ofl) Sewer Water Engineering Backflow (Testable Only) Water Service