2824 W. DE VOY DRPermit Types
BLD MECELE PLM /X
Permit Number:BLD2020-05048
Issued:11/23/2020 CITY OF ANAHEIM
INSPECTION REQUEST LINE:
{714)765-4626
Quarter Section;14
BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-5153
Site Address:2824 W DE VOY DR
Legal Description:N TR 2705 LOT 15
Project Description:Reroof:Tear off existing material and replace with 3,000 sq.ft.of asphalt shingles over house and
attached garage.REF:INV2020-00357
$7,000.00
N/A,,
341.91
Valuation:
Construcion Types:
Total Fees paid for Permit:
People Associated with Project:
Owner MARIUS ROSCA 2824 W DEVOY DR ANAHEIM CA 92804-3909
Electrical Fixtures Qty Type Qty TypePlumbingFixtures Mechanical Fixtures QtyType
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance.A new permit is required to commence or continue work.fbld_,permit combo
FINAL INSPECTIONS DATE INSPECTORCityofAnaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made,Engineering Final (714)765-5126
INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)COA/Migation Measures
Do not install subfloor or pour floor slab until the foilwing applicable items have been
Signed Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed //-Z /Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONSMechanical(Groundwork)
Building InspectionsElectrical(Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after PIbg.,Ele.,Mec.&Fire)
insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
!Dq not backfill smnecl off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service