Loading...
1751 S. GARDEN DRPermit Types CITY OF ANAHEIMPLMBLDELEMEC X BUILDING DIVISION 200 S.ANAHEIM BLVD, 1714)765 -5153 Permit Number;BLD2023-03418 Issued:07/11/2023 www.anaheim.net/building (714)765-4626 Quarter Section:43 Site Address:1751 S GARDEN DR,Anaheim,CA 92804 Legal Description:N TR 1931 BLK LOT 6 APN:12860215 Project Description:Plumbing for repipe using ABS for bathroom,kitchen and laundry room Number of Stories:1LivingArea: Garage Area: Carport Area: Balcony /Deck Area: Valuation:0.00 Construction Types: Occupancy Groups: Fire Spnnklered: Total Fees paid for Permit: N/A Cool Roof:167.00 People Associated with Project: 3150 E BIRCH ST200205291032294650 BREA.CA 92821Contractor Permit Applicant Owner SERVICE CHAMPIONS PLUMBING HEATING & Lalauni Brimacomb BURNETTE.ROBERTA A TR R 1751 S GARDEN DR Type Qty TypeElectricalFixtures Plumbing Fixtures Qty Mechanical Fixtures Qty Repair/Drainage Alleration/Vent Piping The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the dale of permit issuance.A new permit is required to commence or continue work. DATE INSPECTORFINALINSPECTIONS City of Anaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 Fire Sprinkler (ONLY)(714)765-5041DATEINSPECTORINSPECTION Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Water Engineering (714)765-4591Plumbing(Ground/Underfloor Drain Waste) Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer COA/Migation MeasuresSetback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been sioned , Building Final (714 765-5153) Last Inspection-Final Only After Above Completed ●7-Z.3Plumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.)rtu Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed: 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out)i. Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/MItagation Measures Framing (Only after PIbg..Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or piaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor (Do not backfill unless signed off Sewer Water Engineering Backflow (Testable Only) Water Service