217 N. DALE AVEPv /Permit Types VBLDELEMECPLM
XX
Permit Number:BLD2021-04550
Issued:10/14/2021 CITY OF ANAHEIM
INSPECTION REQUEST LINE;
(714)765-4626
Quarter Section:12
BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-5153E^?
SiteAddress:217 N DALE AVE
Legal Description:N TR 3099 LOT 33
Project Description:Residential Photovoltaic System
S12.600.00
N/A.,
Valuation:
Construcion Types:
Fire Sprinklered?
Cool Roof
Total Fees paid for Permit:
No
No
167.00
People Associated with Project:
5 A STREET AUBURN MA 01581
217 N DALE ST ANAHEIM CA 92801-4816
BRIGHT PLANETContractor
Owner
Permit Applicant
CHRISTINE PUENTES
KEVIN PHAM
QtyQtyTypeQtyTypeMechanicalFixturesPlumbingFixturesElectricalFixturesType
Generators/Transformers -1 to 10 hp,1 to
75 kva
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance.A new permit is required to commence or continue work.fbid peimil combo
FINAL INSPECTIONS DATE INSPECTOR
City of Anaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041INSPECTION
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
B.,,“n^StcTtON
NO I (JUMPLETEC
ECTIONSMechanical(Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
\V /IM /Floor Nailing (Raised Foundation Only)DATF.:
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after PIbg..Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or piaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-iMeter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
si'|fi(-r|pitl>L)Q noi l)H!.:ktill uni'.
Sewer
Water Engineering Backflow (Testable Only)
Water Service
PV TOOLKIT DOCUMENT tt3
Your Qty }1logohere Solar PV Standard Plan —Simplified
Central/String Inverter Systems for One-
and Two-Family Dwellings
\./
SCOPE:Use th is plan ONLYfor electrical reyewof utility central/string inverter systems not exceeding a system AC inverter output arting
of 10k Won the roof of a one-ortwo-femily dwelling or accessory building.The specific structural and fire requirements are covered in
otherpartsof the California Solar Permitting Guidebook.This covers photovoltaic system interconnected to the load side of a single-phase
AC service panel ofnominall20/240Vacwitha bus barratingof225Aorl ess.Plan also applies ot supply side ODnnectjons (between the
meterandthe service disconnects),where permitted by the local utility.This plan is not intended for bipolar systems,hybrid systems or
systems that utilize storage batteries,charge controllers,trackers,more than two inverters,or strings combined.Systems must be in
compliancewithcurrentCalifbrniaBuildingStandardsCodesandlocalame ndmentsoftheauthorityhavingjurisdiction (AHJ).Other
Articles of the California Electrical Code (CEC)shall applyasspedfied in 690.3.For systems beyond this scope or the criteria in this plan,
cons uitthe AHJ for details regarding comprehensive process.
MANUFACTURER’S SPEC!FICATION SHEETS MUST BE PROVIDED for proposed inverters,modules,combiner/junction boxes,racking
systems,and rapid shutdown system or equipment.Installation instructions for bondingand grounding equipment and rapid
shutdown systems shall be provided,and local AHJs may require additional details.Listed and labeled equipment shall be installed
and used in accordance with any instructions included in the listing or labeling (CEC 110.3).Equipment intended for use with PV
system shall be listed for the PV application (CEC 690.4(B)).
217 North Dale Avenue,Anaheim,CA 92801 Permit#:JobAddress:
Contractor/Engineer Name:Bright Planet Solar
Signature:.
Total #of Inverters installed:
Calculation Sheets"and the "Load Center Calculations"if a new load center is to be used.)
License#and Class:C-IQ 1020761
Date:10/14/2021 Phone Number:8889974469
(If more than one inverter,complete and attach the "Supplemental1
5000 WattsInverter1ACOutputPowerRating:
Inverter 2 AC Output Power Rating (if applicable):,Watts
.<10,000 WattsCombinedInverterOutputPowerRating:
Ambient Temperature Adjustment Factors:select the box forthe expected lowest ambient temperature (TJ
with the corresponding Ambient Temperature Correction Factor (Cf):
1)^If TLisgreaterthanor equalto-SX,Cf=1.12
IfTL is between -6‘’Cand -lOX,Cp =1.14
Average ambient high temperature (Th)^47°C
Note:Fora lowerT ora higherTn,this plan is not applicable.
□
DCInformation:
Model:LR4-60HPB-350MModuleManufacturer:LQNGI
2)ModuleVnr(frommodulenameplate):40.4 yplts
ll.t^nps
ISYes DNo (If No,thisplanisnotapplicable.)
3)Module lsc(from module nameplate):
Is Module Isc lessthan 13Amps?
4)Module DC output power under standard test conditions (STC)=350 Watts (STC)
Part 3:PV Toolkitfor Local Governments 26
5)DC Module Layout
Identify each source circuit (string)for i nverter 1 shown on
the roof plan with a Tag (e.g.A,B,C,...)Numberof modules persource circuitforinverterl
1.MAIN SERVICE PANEL 18
2.UTILITY METER
3.AC DISCONNECT.
5.INVERTER &INTEGRATED
DC DISCONNECT.
Total n umber of source ci rcuits for inverter 1:
6)Are DC/DC Converters used?S Yes □No If No,skip to Step 7.If Yes enter info below.
DC/DCConverterModel#:SOLAR EDGE P401
Max DC Output Current:15
Max#of DC/DC Converters in an Input Orcuit:_18.
DC/DC Conve rte r Ma x DC I nput Voltage:60 Volts
Ma X DC Output Cu rre nt:.
DC/DC Conve rte r Max DC I nput Power:401 Watts
60Amps Volts
7)MaximumSystem DC Voltage
Only use for systems without DC/DC converters.
A.McxJule Vo^(Step2)x #of modules in series (Step 5)xCF(Stepl)V
Table 1.Ma>dmum Numberof PV Modules in Series Based on Module Rated Vdcfor 600 Vdc Rated Equipment (CEC690.7)
Max.Rated Module Voc
if Cf=1.12 (Volts)29.76 31.51 33.48 35.71 38.27 41.21 44.64 48.70 53.57 59.52 66.96 76.53 89.29
Max.Rated Module Voc
if Cf =i.i4 (Volts)29.24 30.96 32.89 35.09 37.59 40.49 43.86 47.85 52.63 58.48 65.79 75.19 87.72
Max #of Modules for 600 Vfc 18 17 16 15 14 13 12 11 10 9 7 6
Only use for systems with DC/DC converters.The value calculated below must be less than DC/DC conve rte
max DC input voltage (Step6).
B.Module V^^(Step 2)40.4 x#ofmodules perconverter (Steo6)18 xCr(Stepl)1.12 727 V
Table2.Larges t Module Vq:for Si n^e-Module DC/DC Converter Configurations (withSOV AFCi Cap)(CEC 690.7 and 690.11)
Max.Rated Module Vcc
ifCF=1.12 (Volts)30.4 33.0 35.7 38.4 41.1 43.8 46.4 49.1 51.8 54.5 57.1 59.8 62.5 65.2 67.9 70.5
Max.Rated Module Voc
if Cf=1.14 (Volts)29.8 32.5 35.1 37.7 40.4 43.0 45.6 48.2 50.9 53.5 56.1 58.8 61.4 64.0 66.7 69.3
DC/DC Converter Max DC Input
(Step #6)(\blts)34 37 40 43 46 5249 55 58 61 64 67 70 73 76 79
8}MaximumSystem DC Voltage from DC/DC Convertersto Inverter —Only required ifYesinStep6
MaximumSystem DC Voltage =Volts
9)SizingSource Circuit Conductors
Source Circuit ConductorSize =Min.#10 AWG copper conductor,90"C wet(USE-2,PV Wire,
XHHW-2,THWN-2,RHW-2)
For up to 8 current-carrying conductors in roof-mounted conduit exposed to sunlight at least
'A"from the roof covering.(CEC310)
Note:For over 8 current-carrying conductors in the conduit or mounting height of lowerthan
'A"from the roof,this plan is not applicable.
Part 3;PV Toolkitfor Local Governments 27
10)InverterDCDisconnectDoestheinverterhave an integrated DCdisconnect?d^es □No
If No,the external DC disconnect to be installed is rated for
11)Inverterinformation
Manufacturer:SOLAR EDGE
Max.Continuous ACOutput Current Rating:
Max.ShortCircuitCurrentPerlnout:13.5 Amps
Does PV Module Uc (Step 3)exceed value above?C3^esIntegratedDCArc-Fault Circuit Protection?l3^Yes □No (If No is selected,this plan is not applicable.)
Grounded or Underground System?^Grounded DUngrounded
IfYes,skipto Stepll.
Volts (DC)Amps (DC)and
SE5000H-USRGMModel:
21 Amps
No (If No,this plan is not applicable.)
AC Information:
12)Sizing Inverter Output CircuitCond^uctors and OCPD
Amps (Table 3)30lnverterOutputOCPDrating=
Inverter Output Circuit Conductor Size =10 A\A/G (Tables)
Ta ble 3.Mi nimum Inverter Output OCPD a nd Circuit Conductor Size
40 483236282024inverterContinuousOutputCurrentRating(Amps)(Step 11)12 16
50 6045354030MinimumOCPDSize(Amps)20 2515
6661081210MinimumConductorSize(AWG,75'C,Copper)14
13)Point of Connection to Utility-lnverter(s)must be connected to either load or supply side of service
disconnecting means.Only one ofthe sub-sections belo\A/and eith^Single Line Diagram#!or Single Line
Diagram #2 should be filled out.
Only use this section for connections on the load side of the service disconnecting means.
Isthe PV OCPD positioned attheoppositeendfrom input feeder location or main
OCPD location?
^Yes □No (If No,then use 100%row in Table 4)
Load side connections (Per705.12(D)(2)(3)(c)):
(Combined inverter output OCPD size +Main OCPD size)<[bus bar size x (100%or 120%)]
Table 4.Ma)«mum Combined Supply OCPDs Based on Bus Bar Rating (Amps)per CEC705.12(D)(2){3)(b)
225 225200225200200125125BusBarRating(Amps)100
200 225200175150175100125MainOCPD(Amps)100
60*60*4560*60*40205025MaxCombinedPVSystemOCPD(s)atl20%ofBus Bar Rating
50 25 025050MaxCombinedPVSystemOCPD(s)atl00%Bus Bar Rating 25 00
*This value has been lowered toSOAfrom thecalculated value to reflect 10 kWAC size maximum.
Reductionofthemainbreakerisnot permitted with this plan.Interconnectionto center-fed panelboards may
be permitted per Informational Bulletin.^
Only use this section forconnections on the supply side of the service disconnecting means (between the
utility mete rand the service disconnecting means).Select one:
^Utility-and AHJ-approved meter socket adapter.
Adapter name/model:
□Service equipment listed forthe purpose of PV interconnection.
Description/model number(s):^
^See Page 8,Part 1 of California Solar Permitting Guidebook for guidance.See CABSC's Information Bulletin 16-03.
Part 3:PV Toolkitfor Local Governments 28
14)Rapid Shutdown^
The rapid shutdown initiation device shall be labeled accordingtoCEC 690.56(C),and its location shall
be shown on the site plan drawing.The rapid shutdown initiation device may be the inverter output
or input circuits'disconnecting means,the service main disconnect,ora separate device as approved
by the AHJ.The disconnecting means shall be identified forthe purpose,suitablefortheir
environment,and listed as a disconnecting means.A single rapid shutdown initiation device shall
operate all disconnecting means necessary to control conductors in compliance with CEC 690.12.
Note:Check with the AHJ regarding approval where field verification of reduction of voltage within
the time required by CEC 690.12 is performed.
Rapid shutdown shall be provided as required by CEC 690.12 with one of the following methods
(Selectone):
D The inverter(s)iswithinlOfeet of the array,and the location of the inverter issuch that
uncontrolled PV system conductors are no greater than 5 feetof length within the building.A
remotely-controlled AC disconnecting means is required immediately adjacent to or as close
practicable tothe inverters,and located within lOfeet of the array.
□The inverter(s)is within lOfeet of the array,and the location of the inverter is such that
uncontrolled PV system conductors are nogreaterthan 5 feet oflength within the building.
Reduction of the voltage forthe inverteroutputwithin the time required by CEC 690.12 shall be
verified in the field,orthe inverter output is listed to UL1741 with rapid shutdown capability.
□Remotely-controlled DC disconnecting means are located within lOfeet of the PV array and DC
input of the inverter(s),and the locations of the disconnecting means are such that uncontrolled
PV system conductors are nogreaterthan 5 feetof length within the building.Reduction of the
voltage forthe inverteroutputwithin the time required by CEC 690.12 shall be verified in the
field,orthe inverter output is listed to UL1741 with rapid shutdown capability.
□Remotely-controlled DC disconnecting means is located within lOfeet of the array at the DC
input of inverter(s)connected to a module level DC-DC converter circuit where the DC-DC
converter circuit meets the requirements for controlled conductors when disconnected from the
inverter.Reduction ofthe voltage forthe DC-DC converter output and the inverteroutputwithin
thetime required by CEC 690.12 shall be verified in the field,orthe DC-DC converteroutput and
the inverter output are listed to UL 1741 with rapid shutdown capability,
n A UL 1741-listed and identified inverter(s)with input and output rapid shutdown capability
supplying module level DC-DC converter circuit where the DC-DCconvertercircuit meets the
requirements for controlled conductors when disconnected from the inverter.
S A UL 1741-listed rapid shutdown system:Manufacturer:SOLAR EDGE RAPID SHUT DOWN
Testing Agency Name:
System Model Number:ihc inlcrnaLcomponents may vary depcmnni?on the .Safety Switch model:the figuresSystemComponents:documents show Ihc AC/DC Safety Switch for single phase inverters.
as
15)Groundingand Bonding of Modulesand Racking System (selectone):
B Racking system listed to UL 2703 using modules identified in the listing.
□Other method subject to AHJ approval
^See Page 8,Part 1 ofthe California Solar Permitting Guidebook for guidance.See CA BSC's Information Bulletin 16-03.
Part 3:PV Toolkitfor Local Governments 29
Solar PV Standard Plan —Simplified
Central/String InverterSystems for One-and Two-Family Dwellings
Markings
CEC Articles 690 and 705 and CA Residential Code Section R324require the following labels or markings be
installed atthese componentsofthe photovoltaic system:
WARNING
DUAL POWER SOURCES
SECOND SOURCE IS PHOTOVOLTAIC SYSTEM
RATED AC OUTPUT CURRENT-_AMPS AC
NORMAL OPERATING VOLTAGE
WARNING
INVERTER OUTPUT CONNEC nON;
DO NOTRELOCATE TIMS
OVERCURRINT DEVICE VOLTS
CEX:705.12(DX2)(3Xb)
[Not required if panel board is rated not
less than sum ofampcre ratings ofall
overcurrent devices supplying it)
CEC 690.54
PV SYSTEM AC DISCONNECT
RATED ACOllTPUTCURRENT -21 AMPS
AC NO RMAL O PERA DNG VO LTAGE 240/0 LTS
A
WARNING
ELECTRIC SHOCKHAZARD.THE DC
CONDUCTORS OFTHIS PHOTOVOLTAIC
SYSTEM ARE UNGROUNDED AND MAY '♦““
BE ENERGIZED '
C
CEC 690.54
I
I WARNING
ELECTRIC SHOCKHAZARD
IF A GROUND FAULT IS INDICATED,
NO RMALLY G RO UNDER C O NDUCTO RS
MAY BEUNGROUNDED AND ENERGIZED
V
CEC 690.35(E)
[O nly required for ungrou nded systems)INVERTER
-i
CEC690.5(C)
[Normally already present on listed inverters]WARNING:PHOTOVOLTAIC
POWER SOURCE 1
TTl WARNING
ELECTRIC SHOCKHAZARD
DO NOTTOUCH TERMINALS
TERMINALS ON BOTH LINE AND LOAD
SIDES MAY BE ENERGIZED IN THE
OPEN POSITTON
CEC 690.31(G)(3).[Marked onjunction/combinerboxes I
and conduit every lO’j
I'1 1 □nj
CEC 690.17(E)CkJ/Box
y.\
PVSYS IEM DC DISCONNECT
RATED MAX POWER-POINTCURRENT-15 ADC
RATED MAX POWER-POINTVOLTAGE-48ft'PC
MAXIMUM CIRCUITCURRENT-
MAXIMUM SYSTEM VOLTAGES
13.5 ^4:DC
DC
WARNING:
THIS EQUIPMENT FED BY MULTIPLE SOURCES.
TOTAL RATING OF ALL OVERCURRENT DEVICES,
EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE,
SHALL NOT EXCEED AMPACTIY OF BUSBAR.
CEC 690.53
PHOTOVOLTAIC SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
CEC 690.56(C)CEC 705.12(D)(2)(3)(c)
[Required on newload center if an.swcrcd“No”to StcpS13|
Informational note:ANSI Z535.4-2011 provides guidelines for the design of safety signs and labels for application to products.A
phenolic plaque with contrasting colors between the text and background would meet the intent of the code for permanency.No type
size is specified,but 20 point (3/8”)should be considered the minimum.
CEC 705.12 requires a permanent plaque or directory denoting all electric power sourcesonorin the premises or rapid fire
shutdown equipment.
Part 3:PV Toolkitfor Local Governments 30
Solar PV Standard Plan —Simplified
Central/String InverterSystemsforOne-and Two-Family Dwellings
DESCRIPTION
SINGLE-LINE DIAGRAM #1 -LOAD SIDE CONNECTIONSOLARPVMODULE/STRING1 i,o\c:iu<j.eoitrK.Mn.\/
DQDC CONVERTERS INSTai i cn?vg<t ,kin |.g ^^SOURCE CIRCUIT JUNCTION POX INSTAUED7:g /NOSEPARATEDCDISCONNECTINSTALLED?;X£S I NO
INTERNAL INVERTER DC DISCONNECT:'^7150
7
3
4 E)GROUNDED (INaUOE GEC|
□UNGROUNDED
CHECK A BOX FOR WHETHER SYSTEM IS GROUNDED OR UNGROUNDED:
REFER TO STEP 14 FOR RAPID SHUTDOWN DETAILS
FOR UNGROUNDED SYSTEMS;
-DC OCPD MUST DBCONNECT BOTH COWUCTORS OF EACH SOURCE QRCUIT
●UNGROUNDED CONDUCTORS MUST BE IDENTIFIED PER 210.5(q.WHITE-FINISHEO CONDUCTORS ARE NOT PERMITTED.
S
(CENTRAL INVERTER solar EDGE se-somh-usrgm
LOAD CENTER MSTALLE07:YES /NO
PV PRODUCTION METER INSTALLED?:YES /NO
●SEPARATE AC DBCONNECT INSTALLED?:JL£a_LJIO
CONNECT TO INVERTER K MSELWEOIAORAM 3)
7
8
9
10
●Cemult with your local AHi and /or UtiSty
(J)PMtN 5CRVKE Pr
●USBA8 UTINC:..
5—^MODULES
A A A±I A+MAM OCPD
MTW6: lI aI9MCX)UL^[
A rfrMcatmodules;OCPOlUnNG:30
MODULES!f C82
.SOLAR EDGEInverterMake:
Inverter Model;SE-5000H D"O A0>
3 ENTER 'N/A*WHERE SUITABLE FOR
WHEN NOT USINGCONOurr OR CABLE
ASPERMITTEOBVCODE
OJ
<
o
o □
CONDUaOR/CONDurr schedule
o CONDUCTOR NUMBER OF
CONDLKTORS
CONDUIT/CAB L£TAG DESCRIPTION AND CONDUCTOR TYPE CONDUIT StZES’SIZE TYPE
USE-2-OR PV WIRE X #10 4A IN FREE AIRo>
#6EGC/GEC 1 IN FREE AIR SOLID BAR ECD#HIo8TlIWN-2 4&M)G EMT 1/4'<
EGC/GEC
'5~&(I)G ■EltTT nr3CTHWN-2 #8 gEGC/GECfClHWN-2 #{<љ TSTTTTT TMT0
(/)
U)
SOLAR PV STANDARD PLAN
Roof Layout Diagram for One-and Two-Family Dwellings
-o
Oj
a.
IM
-o
<
oo
o
S'
r>
(u
C)
O
<
ro
3
3n>
3
cr
Items required:roof layout of all panels,modules,clear access
pathways and approximate locations of electrical disconnecting
means,roof access points,and rapid shutdown initiation device.
LR4-60HPB 345-365MHM04II1
(Black}LR4-60HPB
345-365M Opcrgting P>r3rr>eur$
1^41 1 '
High Efficiency
Low LID Mono PERC with
Half-cut Technology
●T«
I
.i
Eltctrical Characlen&lick
●4 iU*i
10-yvw Mwiwnv lor MwnMt and Proceuaio.
K-y«a><iMrraiily lor Extra Lmeai Putw Oulaui
(wr*rH.
'H
\A *●
Ft«K Mt M»M*m Mj*«
liM tdrfilial—ttnr
<««4Kd
mik«rM0A
W*Wt«p0tM««●*C'«dVMrf .
mMJfWMdCw>wCrvaviHVM*Ce C*
@,.o ftpdxM
ilywMA*'
i/.|*-●
LONGILONGI.tK«M
/Single Phase Inverter
with HD-Wave Technology for North America
SE3000H-US /SE3800H-US /SE5000H-US /SE6000H-US/
SE7600H-US /SE10000H-US /SEl 1400H-USSinglePhaseInverter
with HD-Wave Technology
for North America
SE3000H-US /SE3800H-US /SE5000H-US /SE6000H-US /
SE7600H-US /SE10000H-US /SE11400H-US
Se3«0M US SEinOOH US SCSW3H US SEfOOOH US St?C<HJH>US SE1QWQK<OUTW
Juco*.OiKMji j)ca«Mv
I8CC«
)X0*
#'Ositrsd ●XMV
OjSu1VM«9«i
^tM]Hf.
Ur 'Meo
;b.|t«»«*acv 5»i
Hi f j»
U0iTv*ro«
*'j Bir«rg
l*MyMk
INPUT
S
73nM
LO
'X3T
9»0
77»
V90C
●2cev
r«ucvo*^
iw
●●●●
WS
92C«V*n«
P'wno'
«
Eta>*ry
Co«'W'^PWnr^*w«i
ADDITIONAL FtATURES
S.?iQ^np«pn«ft
ft«MSNMOw"*W
;o<rMov Aglv-axoptimizedinstallationwithHD-Wave technology STANDARD COMPLIANCE
uiiM ji i C«-*»4r lK<Or»49te'
/Extremely smaH/Specifk«ly d#$i9n«d to worii ¥iith
power optimizers
/Re<onf^r<Aking effioency
Owi
»●
INSTALLATION SPECIFICATIONS/BuilHn modkie4«vel monhoring
UNJ*
/Outdoor end lr>door instaUat^n/Fined voltA^e inverter for longer sthngs kVt4
trv*/v«/'
fault protection and rapid shutdown for $Integrated
NEC 2014 and 2017,per article $9011 and 69012
Optional Revenue grade data.ANSI C12.20
Class O S (O.S%accuracy)
t I ■?!Hi!»/HA>i^«rr UVy
UL1741 SA certified,for CPUC Rule 21 grid
coiT4>l*af>ce
t
»»"«<«●Bd-ojT●l«0/
solarSTaftT?soloret^com
RoHS
●olarjSifnr.ftopid Shutdetm UH ●tnitatottof*oftd Co/^gurotjof\(Stn^k kntfXtfi)
●olarJUnTT.
Rapid Shutdown Kit -Installation and Configuration
(Single Phase Inverters)
Ihh 0«<tlbn How to IrKtaN th«rapid shutdown kit
«h Hi rtn wfi f ure In 1 ho tnvoft pt (n ordor
690.13 (Ijlhtoi^n {*\.
6 The rapid shutdown cables have a resistor coAoected to one end (on the red cable).Connect these ends to the swftch.
mahlni sure that rhc red and Hack cables are reversed re<at>»e to the caHes connected at the top of the switch <foln|Mo
the DC side conduA between the inverter and the Sefety Switch),as delated below.Apply a toroue of 2 N*m (U b*Mj
*rt the cables at the top are red a nd Hack from left to rlftvt con ne<t as s hown below.the Solar(d|e $af^Switch,and howio enable the rapid
provide the funcilonalily desr rlhed In the Rapid Shutdo«<lai of hEC?01d
Kit ContontB
*Raptdshutdown cables
*MKto SD card and SO card adapter with IIrmware files (Note:DO NOT THROW AWAY TH€CARD ANDTHC ADARTCA;keep
1he«T>for innallatlon of other rapid shutdowr«kksj
C»b1«ln$Ullation
PeefortMhK procedure before connecting the strinfs lo the Safety Switch (Chapter 4:Connectlnt the AC and theSCrMfs to the
Safety SwAch in the Seforfdpe RisfoMfron Guiie\.
1 Turn C he invtflet ON/Of F switch to OF F.K installn|l he kA In a n Irivetter Chat K already (^matins,wan unt I the ICD
wd Kates that the DC voAate is safe (<SCV}.or waA five minutes before contMuinito the neit step.
2 Turn the Safety SwAch and the AC swAch on the main circuit board to OFF.
A &QSXB
tfybu MFiRDtaae ^
eapodlors of the mverter to diaoharge
9 Loosen the four Allen screws on thefront
panel,or if a nwMjnebon w indieated the LCD penei.wah five iMnulea for tie Input
of the Safety SwAch.and open the'
4 Carefully dhconneci the two DC cables from the left sMe of 1h«swflch and from the DC connection sprFnj clamp terminals,
as iiiifstrated below’Use a standard strai|ht>Haded screwdriver lo disconnect the cables from thetetminaK.
*If the cables ai the top Hack and red from lefi to right,conned
'.<●1
a-«BMWf<wen
Oeswwted Mr*
●NadoxfWMawr
S'AapH «wna*wn«aw*●●
6 Use a standard straight Haded screwdriver to connect the other end of the rapidthutdown cables to the DC connection
sprlng<LamplerminaH;Connect the Hack cable from the swflch to the DC*fermlnal Heck,and connect the red cable from
the switch to the DC*terminal Hock.
7 Check that the caHes
Fwv'»<MiWVwACW l*Mv
located and connected m the correct posAiom to ensure the rapid shutdown functionaHy.
6 Close ihecpvff:Attach the switch cover and secure A by tighrenwg the four screws with a torque of 0.9 ft.*<b/12 N*i
'W*rr>*l wwt »Wy diMnArre *
}4 kWtrNWWn
»s«s*CTS«Mrii >*i et apcwMu 'Im ac/c<$*b*r swuKkr k^p4 m«w
1flop«fhurdewir Kft ImlolMhn ●MAN-C2-CQ)$6-i.S ffepltf Vtuldown HH InsfoMcfion ●MAfWOl ●COitS-}.6
aol»rJ20^__flopid SAutdOk kitj insfQftefroo ond Configuieiton (Single Phase Invents}
Inverter Software Compatibility Check and Upgrade "OPowerOptimizerPerformthisprocedureafteractivatingthemvertef(Step}m Chapter Commbsloning the tnsUlallon of the Soidrfdpp
eiFfoPdfion DvfdeL eod before pav mg {Step 2 in Chapter S of 1 he Schf£^tnyroflofron OuAFe).
'the rapid shutdown feature,the mverter communkatlon board fir mwa re {CPUj must bet
●Version 3.0700 or higher.Hthe CPU version b 2Xw
●Version 3 0700 or higher.If the CPU version b IX»*
OToForNorthAmerica
P320 /P340 /P370 /P400 /P401 /P405 /P485 /P505
b To che<k the inverter CPU version:
i Verity that the Inverter has been activated using the acth/atlc
2 Press the LCD light button short ptesm until the screen below Is leachecf.
ird supplied with the inverter.7D
o19ChecktheCPUversionnumberIflowerthan3.0700.upgrade the Inverter software as described betow;otherwise proceed
to “Power Opfimfrer Fokins'."D
k To upgrodo tho inverter eoftware:
Use the supplied SO card adapter or the mlcro-$0 card,whkh <ar>be removed from the adapter,according to the acthalion
card slot on you*eweder communication board,labeled SS2B2I
1 VerRylhattheAC breaker connected to The Inverter Is OFF.
2 Open the Mvener cover's six Ahen screws and caref uHy pul Che cover horliontaby before iowerlrv K.as described m rs
manual.
2 insert the card Into the card slot on the communication board,rf the communKatior)board has an SD card slot,use the
supplied SO card adapter.rl there b a trJero-SD card slot,remove the micro-SD card from the adaptor and insert R.
and turn the AC on.If upgrade Is required (as described above),fl starts automat kally.
S Wan for the message "Done'to be dopiayed on the LCD.
6 Verify the correct vetslor>as described above.
7 Remove the card from the Inverter and keep it for additional kit imta Hat ions.
N
4 Close the inverter I 73
Power Optlmiier Pairing
Pair Ing at this stage wll reprogra m the power opclmiMrs to perform rapid shutdown.
1 Verify that the DN/OFf swflch at the bottom of the Invener b OF F.
2 Turn ON the AC Heake*andthe Safety SwAch.
9 Pert or m Pairing as des<tibed in Step 2:Pairing of Chapter S:Commbslonint of The Sototld^e eutoAonon <M/ide.PV power optimization at the module-level
Bjiabllng fUpld Shutdown /Specifically deserved to work with Soiarfdge
irwerlers
/Fast inslalalion with a single boh
There is an option k>setup mode to enable the functionalRy of rapid shutdown.
1 verify that Ihe ON/OFF swflch at the bottom of the Inverter b ON.
2 (nter Setup mode by pressing and holding the LCD light button.
3 Select Maintananea ^Optlmiier Canf ^Sat Rapid Shutdown.
Wharievar raplaeir>g.remowtg or adding a componani In the abirtg.perform Pavmg and rapid shutdown aatting
/Next gerseratien maintenance with module*
level monllonng/Upto2S%energy
/Superior efTKierscy (995%)/Meets NK requirements for
prelection {AFCI)and Photovoltaic Rapid
Shutdown System (PVRSS)
/Module-level vohage shutdc
artd firefighter safety
fault
/Mitigates all types of module mismalch I
from
shadirvg
/Flexible system design for maximum space
utilisation
nufacturing tolerance to partial
for installer
roubli >ling
production mode and the LCD daplays Night Mode,the connect Ion order Of the raprd shutdown
that the rapidshutdown caHes connected lothe bottom of the
reversed relative to the caHes connected at the top of the swflch (see Figiee 2 and Figure S).
rf the invenet does
cables may be Nk Of rect.Recheck the caHes and male'
SwRCh
solarJiEirsolaredgecofn
AapW SAutdewn Iflf instalhtho ■hUMU-OOli^Lt
/Power Optimizer
For North America
P320 /P340 /P370 /P400 /P401 /P405 /P485 /P505
Snap rack Ultra Rail
Solar Mounting Solutioni
PJ70 MO)MOS PSO$MOO
<ler7Z«i
Wand 72-9^^
modulo)
Ultra Railfm
{for W<*l poww
modute)#0<H
modulai}
(lerhighDptrrnmod*)
<*VP«4l fncduW
COiTv>«tlriUtv}
(foi hlqh (for der h^wrvelta^velu^
modulM)module)modulas)
curront«nd72c«a
modul«»)<*■
moOubw)
Itm/T
I I
>I7>-ti»
ci
I
gj
oumn DuMNs onMiicn <twtn wmiani coNNtcitp to obwtiwo souwog iwvcttpp
IWa«««W>OkrVw''e.
OJmn DURING ^ANOrr (POWER OPTMOB DtSCONNtaEO ROM SOURDGf MVEICtlROR SOUUVDGC MVCRTBOR)
STAfghBD COMPliWa
INSTALiAT)ON SPfeOflCATtONS
*1 AVMi^i S((«^
r^TTFTC4r«K»f
<w 111 The Ultimate Value in Rooftop Solarr»i1H
00/1*?S?/t7 iQO*/;a v'h
IfCUl C«VW(14t MT4M
MAi/OU Mounts available for all
roof types
Industry leading Wire
Management Solutions
irMJlWr*(«r^
i2/)»
X/t
><c^c>3^M«r<
(WtJT’r Compatible with all
Series 100 Module
Clamps &Accessories
An install experience
unlike any other ●A
HD Wew
$1^1*1*0^r40l
Start InstdJIing Uttre Rail Today●us*SE114C0 erwr*M^aorvit^O*^10<
t/i«>yrgp
I MaHvaMKif^B snapnrack.com/resources
snapnrack.com/configurator
snapnrack.com/where-to-buy
●r<*QM,M«*iBVBarr;RESOURCES
DESIGN
WHERE TO BUYRoHS
The SnapNrack Ultra Rail
is a sieek,iightweight raii solution for mounting solar modules on the roof.
The Entire System is a Snap to Install
*New Ultra Rail Mounts include snap-in brackets
for attaching rail
●Compatible with all the SnapNrack Mid Clamps
and End Clamps customers love
●Universal End Clamps and snap-in End Caps
provide a clean look to the array edge
Unparalleled Wire Management
●Open rail channel provides room for running
wires resulting In a long-lasting quality install
■Industry best wire management offering
Includes Junction Boxes,Universal Wire
Clamps,MLPE Attachment Kits,and Conduit
Clamps
●System is fully bonded and listed to UL 2702
Standard
The Largest Span Capabilities of any Light Rail Solution
This table was prepared In
compliance with applicable
engineering codes and standards.
Values are based on the following
LMlra Rai(.UR«40 Rgil SvUcjti^p,
●ASCE 7-10
●Chapter 30 Wind Loads i
Chapter 7 Snow Loads
●Roof Slope.7-27 deg
●Roof Height:0 -30 ft
●Exposure:B
●Roof Zone:!
●Module Orientation:Portrait
●Roof Type:Comp
Ws/f Sn3pNrack.com for detalJeO
span tables and certifications.
SnapNrQck
Solar Mounting Solutions
Ultra Rail
Sytt*m S0Ai>K*v Residential Roof Mount System
Installation Manualftft$&»n*
4 ft S»an»
Bft A
Quality.Innovative.Superior.
SnapNrack Solar Mounting Solutions are engineered to optimize material use and
labor resources and improve overall installation quality and safety.
c«nuet aftnftpnrack.eomipr)rack.com877-732'2d60 WWW.1
Grounding Specifications Grounding Specifications
YlAflK (Chin*)Co Ltd (EJ20066)-Y|.XXX^29b whe#«XXX k$21S tO 260.YLXXXA>2»b XXX H 270 to 2$S.GROUNDING MARKING DETAIl ?
NRTL llnod PV Medul««:
Ad eempoi>«f>t»«Klud*d in lh«UKrB Roil
UL 2703 Uitln9 grounding/bondlng
(M<k«9«d and morXod with th«UL logo,
$n*pNr»ck Pik tiWM,*nd 'PV Hountlng
Syttom'
BPVkI Sekr Modth 6VM6d10P-XXX Whor*XXX tS 22S to27S;BVM6610H*XXX wh«r«XXX Is 23S to 260:eVM6612P>XXX
whoro XXX Is 270 to 330;6VN6612K-XXX whtfo XXX U 280 to 340.SnopNtod'CanMUn Solar:Modoll CSSP-XXX.P,CSSP.XXX-M arhoro XXX It 200 to JOO;CSSP-XXX-P-SO,CSSK-XXX-P-SD whoro XXX It
240 to 300;CS6K-XXX.M.CS<K-XXX.MS.CSCK-XXX.I4.SD wtioro XXX It 240 to 303;CS3K-XXX.P whoro XXX It 220 to 300;
CSSX-XXX-P whoro XXX la 2S0 to 360;CS6V>XXX-M whoro XXX It 213 10 223;CS6V-XXX-P whoro XXX la 230 to 255;CS3K-
XXX-P whoro XXX It 230 to 310;CS3K-XXX-MS when XXX It 260 10 330;CS1K-XXX<HS whoro XXX It 285 to 345.
242-020S4
IKAfWHACK.
IQMWWO M>P CLAH»,
SI-4SMH tl.tO'lTnH),
BCAOC
Th«SnjpNr«ek Ground Lvg is mar^td with
th«ground symbol
llsco Ground Lugs havs colorod sol
boHi to Indlesta eonrvoctii
y yo/if/y rr 6okr ET*P660XXXea whort XXX Is 200 10 265:ET-P860XXXWB whar*XXX is 200 to 26S:ET-P660XXXWW whara XXX
II200 to 266:ET-P660XXXWWG whara XXX Is 235 to 265;P660XXXWe/WW whara XXX Is 200 to 266 and may ba follewad
by we
200 to 270.
to thaseraws
erounding alactroda conductor WW;PeeOXXXWWG whara XXX Is 240 to 260;M660XXX8B whara XXX Is 260 to 266:M660XXXWW whara XXX is
Hanwha O Cals.B.LlNE PLUS BPR>G4.1<XXX.B.UNE PRO BFR-G4.VXXX,O.BA6E GV*XXX.Q.PEAK Gd-XXX.O.PLU6 BFR-G3>
XXX.Q.PLUS BPR*C4«XXX.O.PLUS BPR'Gd.l-XXX.Q.PLUS ePR-G4.lAAA*XXX.Q.PLUS BRP*GV*XXX.O.PIUS GY-XXX.aPLUS
G4>XXX.Q.PfiO BPRH34*XXX.O.PRO BPP'G4.I-XXX.O.PRO BPR-G4.3-XXX.O.PRO BFR*CY-XXX.O.PRO BLK-GY-XX.Q.PRO
G4*XXX.O.PRO QY-XXX.O.PPO 0Y/6C-XXX.whaft XXX is 245 to 29S:Q.PEAK BLK-G3.1*XXX.aPEAK 8LK-G4.VXXX.Q.P6AK
BLK-G4.1/TAA.XXX.Q.PEAK 03.t-XXX.Q.PEAK G4.VXXX.Q.PEAK G4.1/MAX-XXX,Q.PEAK G4.1/TAA-XXX whara XXX Is 270 to
326:Q.PEAK OUQ BLX-G6*XXX.Q.PEAK DUO GS-XXX wtwra XXX is 290
Ultra Rail has boon tastad with tha foBowing UL Ustad modulas:
Tha Ultra Rail Syslam amploys top-down damps which hava baan avaluatad lor frama-tonystam bonding,at spacIRc mounting
torquas and with tha spacifk moduks lUtad balow.Tha lyltam has baanaisaisad to a manimum Ovar-Currant Oavka (OCD)
protactkn kvai of 20 amps.Tha UL Ria rujmbar is lr>dudad In paranthasas balow.
Hyundai Haavy Industrias Co Ltd (E32S00S):H15-MXXXRG whara XXX Is 2J6 to 27S;HIS-SXXXRG whara XXX U 246 to 296:
HiS>SXXXRW whara XXX is 250 to 266:HiS-MXXXHG whara XXX ts 210 tO 270:HIS-6XXXH0 whara XXX Is 220 to 273,AJI may
ba foBowad by tha suPftx BK or blank.
326.
Hanwha SclarOna:Hodals HSLSOPS-Pe-X-YYYO whara X Is 2
suffixas.
4.and YYY Is 230 to 270,may ba foBowrd by additional
Jnko EOtor (E362479):Modab 2KMXXXP-60.JKHXXXPP-60.JKNXXXP-60-V.JKMXXXP-69-J4.JKMXXXP^0B*J4 whara XXX
Is 200 to 290:JKMXXXP-72.JKHXXXPP-72.JKMXXXP-72-V.JKMXXXPP-72*V whara XXX Is 260 to 360;JKMXXXM-60 whara
XXX b 200 to 306;JKMXXXM-72 wHara XXX Is 2S0 tO 366 JKHXXXPP-60-V whara XXX is 200 (e 300:JKM6XXXP-72 whara
XXX b 250 10 330.
JA SoUr Hodab MP6^0*XXX/SBS whara XXX H 235 to 265;JAMfr-60-XXX/6l whara XXX is 260 to 270:JAP72601-XXX/5C
whara XXX is 316 to 336:JAP6(h>-72-XXX/4B6 Whara XXX b 306 to 326.
LG Ekctronies Inc:Modak LGXXXSIC-G4 whara XXX b 250 to 300:LCXXXN1K-G4 whara XXX H 280 to 300:LGXXXN1C-G4
whara XXX is 280 to 340;LGXXXN2C-G4.LGXXXH2W-G4.whara XXX Is 360 tO 396;LGXXXNrK-Gd,whara XXX Is 360 to
Kyocar*(E467150)-KU-60 lOOO V $arki -KUXXX.whara XXX b 260 275,foBowad -BOCA.-6BPA.-66PA.-BOCA,-6DPA.36$:LCXXX$2C-G4.LCXXX62W-G4.whara XXX H 300 to 360;LGXXXN2C-B3.LCXXXN2W-B3,whara XXX Is 330 to 400;
LGXXX61C-AS whara XXX Is 280 to 320:LGXXXN1C-AS whara XXX Is 320-6DPA,-6HCA.-6HPA.-6XCA.-6XPA.-62CA.-62 PA.-6ZPB.-6ZC8.-6ZPC.-6ZCC.-CZPO,-6ZCD,-6ZPE.6ZCE.-6MPC -6MCC,
-6MPB
34S:LGXXXN1K-A6 whara XXX Is 3t0 to 336.
-6MCB:KU-60 100O V 6arks ●KUXXX.whara XXX is J1S to 336,foBowad by '6BCA.-6BPA -66PA.
LooBl Qraan Enargy Tachndogy Ce..Ltd.:LAS-60-XXXH.LR6-60BK-XXXM,LR60-HV-XXXM,whara XXX Is 270 to 300:LR6-
60PB-XXXH.LR6-60PE-XXXM,LR6-60PH-XXXM,whara XXX Is 280
HbsionSoUr Hodals M6EXXXS06T whara XXX Is 280
XXX It 280 to 300:H6EXXX6QSK whara XXX It 26$to 30$;MSEXXXMK4J and MSEXXXMH6J whara XXX b 320 tO 330;
MS6XXX6Q6W whara XXX It 320 to 340;M$EXXXS04J and nS£XXXS06J whara XXX Is 320 to 360:M$€XXXSQ4$and
MSEXXX6Q6S whara XXX Is 346 tO 366.
LG (E32872S)●LGXXXQ1C-A6 whara XXX b 340 to 385;LGXXXQIK-A6 whara XXX is 31$to 37$.310.
Panasonic (E181640)●VBHNXXXSA16 whara XXX b 320 to 33S;VBHNXXXKA01 and VBHHXXXKA02 whara XXX U 310 to 326:
V6HNXXXKA03 and VBHNXXXKA04 whara XXX is 310 to 325:VBHNXXXSA17 and V6HNXXXSA18 whara XXX is 325 to 335.
290;MSEXXX606K whara XXX Is 270 to 280;H8EXXXSG6T whara
REC Solar AS (E506147);RECXXX.whara XXX is 214 to 270,aO may ba folowad by PE.PE(BLK>.PE-US.PE-U6<BLK>,PEQ2
PEQ3.
REC Solar PTE.LTD-Modal!RECXXXPE whara tha XXX Is 2U to 260;RECXXXTP whara XXX Is 260 to 300,RECXXXTP2
Sarlas whara XXX Is 260 to 300;RECXXXTP IQ whart XXX It 260 to 300;All may ba fellowad by BLK;RECXXXTP72.whara
XXX Is 330 to 346:RECXXX.whara XXX Is 266 to 325.foBowad by PE72,PS72BLK.PE72 Q2
whara XXX Is 29S to 32$,followad by PE72 XV.PE72 XV Q2
Slltab.SLAXXX-M.whara XXX is 260 to 300;SLGXXX-M.whara XXX b 33S to 360.SLAXXX-P,whara XXX Is 260 to 26$;
6L0XXX-P.whara XXX is SOO to $1$;$6AXXX-M.whara XXX b 280 to SCO;SSGXXX-H.whara XXX Is 33$to 360:SSAXXX-P,
whara XXX Is 260 to 260:SSOXXX-P,whara XXX U 300 to 315.
Solar World:Modal!SWXXX-Mono whara XXX is 200 to 300;SWXXX-Hono XL whara XXX Is 320
by Black.
Suniva Inc -OPTXXX-BO-d-YYY whara XXX Is 240 to 300 and YYY H 1O0;OPTXXX-60-4-YYY whara XXX ii 236 to 300 and
rVYIslBO.
Ranaicia Jiangsu Ltd <6812637):JCXXXH-24/Bb Sarlas whara XXX Is 200 to 270:JCXXXM-24/BBh Sarks Whara XXX 1$23S to
270.
PE72 03;RECXXXPE72XV,
Suniva Inc <6333709):MVK-XXX-BO-S-YYV whara XXX Is 235 to 265 and YYY Is 701
250 to 276 and YYY Is 800
7B1:OPT-XXX-60-4.YYY whara XXX is PE72 XV OS.
8B0.
Sunppwar <E24B423)-Gan 3 or Gan 5 frama modals SPR-XYY«##v whara YY raprasants numbari 16.19,20 or 21.and una
rapratants any numbar from 36$to 310 ar>d 274 to 233:Gan 3 or Gan 5 frama modal!$PR*EYY*0O«whara YY raprasants
numbars 16,19.20 or 21.and 008 raprasants any numbar from 34$to 286 and 260 to 225.
360.Al may ba followad
Tala I 6olar <E369349)●TP660P-XXX whara XXX is 235 to 265:TP660M-XXX whara XXX Is 240 to 300:TP672P-XXX whara
360.XXX b 280 to 345;TP672M-XXX whara XXX is 290
Trina Solar Ltd (E30651S)●T6M-XXXPA05.T6M-XXXPA05.05.T6H-XXXPA05.06.whara XXX b 215 to 280;TSH-XXXPDOS.
rSK-XXXPpOS.OS.TSM-XXXPD05.08 whara XXX Is 240 tO 280;TSM-XXXPG06.0ID wharo XXX Is 246 to 27$:TSM*
XXXDD05A(II).T$M-XXXDDG5A.OS(n>.TSH-XXXDDOSA.06(II}whara XXX b 260 (o 300.A|may ba foBowad by Btoek
Whilt.
*Tr1na Solar Ud:Hodals T6H-XXXPD06.002.T6M-XXXPt>06.082,TSH-XXXPD05.0SS.TSM-XXXPP0S.0|$whara XXX 1s 21$to
276:TSK-XXXDD05A.082(II>whart XXX Is 260 to 31$;all may ba foBowad by Black.
46 47
WMechanicalLoadingSpecificationsMechanicalLoadingSpecifications
Tha foOowing compenants hava baan avahsalad for machanicai loading:Hanwha O Calls;O.PRO BPR-fM-XXX.Q.PRO BFR-04.1-XXX:Q.PLUS BFR-G4-XXX:Q.PLUS BPR-G4.1-XXX.aPLUS BPR-03.1*
XXX Whara XXX Is 246 to 295:0,PEAK-G3.I-XXX and Q.PEAK BLK-G3.VXXX whara XXX Is 270 to 32$.Ultra Rail,Mid Clamp,X End Ctamp.univarsal End Clamp.Uhra Rail Spiica,Ultra Rail Composltior\Mount Kits,Standard
Standoff for Ultra Rail,Four Hoia Standoff for Ultra Rail.Haavy Duty Standoff for URra Rail.Natal Roof Basa Standoff for Ultra
Rail,Ultra Rail Corrugatad Block.Standard Bast Saam Clamp for Ultra Rail,Wida Basa $aam Clamp for Ultra Rail Ultra Rail
Univarul Tilt Hook.Ultra Rail Plat Tlla Hook.Flat TUa Rapbcamant Kit for Ultra Rail $Tik Raplacamant Kit for Ultra Rail,W
Til#Raplacamant Kit for Ultra Rail.
LG Elactronici:Modali LGXXXH1C-G4 whara XXX Is 280 to 340;LGXXXS1C-G4 whara XXX Is 260 to 300:LGXXXN1K-G4 whara
il 260 to 330:IGXXXHIK-AS whara XXX Is 310 to 350.
long!Graan Enargy Tachnology Co..Ltd.:LR6-60-XXXH.LR$-eOBK-XXXK.LR60-HV-XXXM.whara XXX li 270
REC Solar PTE.LTD:Modali RECx»PE
whara tha
300.
RECXXXPE-BLK SoHas whara XXX li 214 to 270:RECxmkTP RECXXXTP-BLK Sarlas.Tha UL Listing covars machanicai load ratings for tha following span langths.moduk orlantatlons and downforca,uplift,and
dcwn-slopa ratings:is 260 to 300:RECXXXTP2 RECXXXTP2-BLK Sarks whara XXX is 260 to 300.
SdarWortd Hodals SW XXX mono whara XXX It 200 to 300.may addRionaHy b#foiowad by 'black*.
Saan Onar'Utton CHractron Load Rating (Ib/fY^
Talasun:Medals TP660P-XXX whara XXX is 21$2BS:TP660M-XXX whara XXX iS 210 to 300.Oewnforca 10
6k«t ShoH Sk!HotMHmg UpimLong 5
UlTra Rail has baan tastad with tha foBowIrrg UL Ustad modula!:
:hanlcal loading for Its top-down damps with tha spacffic modulas listadThaUltraRailSystamhasbaanavaluatadfor
balow.Tha UL fila rnimbar is Ihchidad In paranthasas balow,(Tha Astfowfng mo^ki warv a/io avahMfad /or bondmg Pkata
saa GroundMg Spac/fka/lona lacffon J
Hyundai Haavy Indusbias Co Ud <E32SOO$):HIS-MXXXRG whara XXX It 23$to 276:HI6-SXXXRG whara
HIS-SXXXRW whara
is 24$29$:
Is 250 to 265.
JA Solar (E32B263):JAP6-60-XXX/3BB whara XXX Is 236 to 3S0.
JiAkO Solar <E362479>:JKMXXXP-60.JKHXXXPP-60,JKMXXXP-60-J4.JKMXXXP-6CB04 whara XXX Is 200 to 290;
JKMXXXM-60 Whara XXX Is 200 to 305
Panasonic (E181640)-VBHNXXXSA16 whara XXX Is 320 to 535:VBHNXXXKA01 and VBHNXXXKA02 whara XXX b 310 tO 326:
VBHNXXXKA03 and VBHNXXXKA04 whara XXX is 310 to 32$:VBHNXXX5A17 and VeHNXXXSAlB whara XXX is 32$to 335.
RanaSola (E3I2637):Modals JCXXXM-24/Bbh whara XXX Is 336 to 270.
Trina Solar <E$D6$1$):T$H-XXXP005.TSM-XXXPDCS.05 arsd TSM-XXXPPOS.OB,whara XXX 240 to 260;T$M-XXXDD05A<II),
TSM'XXXDD05A.06(I1),TSM-XXXDDOSA.08<II1 Whara XXX Is 260 to 300.
Yingli Solar (E3S7S40)!Modals YLXXXP-29b whart XXX b 215 to 265.
NRTL Ustad PV Hodulai:
Boviat Solar;Modals BVM6610P-XXX whara XXX it 22S to 27S:BVH6610M'XXX whara XXX Is 216 to 260.
Canadian Solar Modds CS6P-XXX-P.CS6P-XXX-M whara XXX it 200 to 300;C66P-XXX-P-SD.CS6K-XXX-P-SD whara XXX is
240 to 300,CSeK-XXX-M,C66K-XXX-M-SD whara XXX b 240 to SOS;CS6K-XXX-P whara XXX ii 220 to IGO.
ET Solar Modals ET-P660XXX8B whara XXX li 200 to 266:ET-P660XXXWB whara XXX b 200 to 265;ET-P680XXXWW
whara XXX Is 200 to 26$:ET-P660XXXWWG whara XXX is 23S le 26S.
snapnrack.com
43
SnopNrockMIftfM9untli>9 SoMloiH
CERTIFICATE OF COMPLIANCE
SnapNrack UL 2703 Fire Classification 2O1BO710-E359313
E359313-20171106
2018-JULY-18
C«rtFfIcat*Njmb«r
Rupert Rftferarie«
ISftU*Da19
February 2015
As of January 1s(,2015 many jurisdictions arc now enforcing codes based upon updates to
the International Building Code (IBC)and UL Standards 1703 (modules)and 2703 (mount
ing systems).The language included in the 2012 IBC requires that the combination of roof
mounted solar modules and racking components is to be considered a system (IBC Section
SUNRUN SOUTH LLC,DBA SNAPNFWCK
776 Fiero Ln
Suite 200
San Luis Obispo CA 83401
Issued lo:
lion of the roof assembly.
Mounting Systems.Mounting Devices.Clamping Devices and
Ground Lugs for Use with Photovoltaic Modules and Panels
Ultra Ran Mounting and Bonding Systems for use with
Pholovollaic Modules,consisting of the following components:
Ultra Rail,Mid Clamp.X End Clamp.Universal End Clamp.Ultra
Rail Spiles,Ulira Rail ComposHlon Mount Kits,Standard Standoff
for UHra Rail.Four Hols Standoff for Ultra Rail,Heavy Duty
Standoff for Ultra Rail,Metal Roof Base Standoff for Ultra Rail.
Ulira Rail Corrugated Block,,Standard Base Seam Clamp for
Ulira Rail,Wide Base Seam Clamp for Ultra Rail.Ultra Rail
Universal Tile Hook,Ultra Rail Flat Tile Hook,Flat Tile
Replacement Kit for Ultra Rail,S Tile Replacement Kit for Ultra
Rail,W Tile Replacement Kit for Ultra Rail,Ultra Rail Hanger Bolt
Clamp,Ground Lugs,Ultra Rail Skirt Assembly,MLPE Frame
Attachment Kit.MLPE Rail ACtachment KIL Smart Clipa.
This Is to certify that
iplss ofThoobjectiveIstoensurethatthe
PV 'V'tr -'●'■
reprvMntAtiv*
‘RO.}
',ed C'f '●
A,6,or C;Class A being the most
●ii.'ime
Since tho physical characteristics of
the PV module (material,thickness
of glass,etc)also potentially al-
'ill .1'l ari^
now tested and assigned a "type”
based upon these characteristics and
hn
.ull'.!1 ';t I '.,jl I ,1..:
fcrcnccs In the module composition and Types 4-15 arc the same module compositions as
Have been investigated by UL in accordance with the
Standard(s)Indicated on this Certificate.●:●.'n Cortil-co
modules,In accordance with the standards set forth In UL1703/2703 and IBC 2012.In or-
!'■;l..'silio.-.iion the Sn.-:\-
the UL-approved Irrstallatlon Manual.Because the lest was conducted with the modules at
'me-
height.
r I
I i"'t A i V ANSIAJL 2703,Mounting Systems,Mounting Devicas,
ClampingiRstention Devices,And Ground Lugs for use with Flat-
Plate Pholowaltaic Modules and Panels
See the UL Online Certifications Directory at
www.ui.com/oatabase for additional information
Stands rd{s)for Safaly;
Additional Inlonnation;
Attachment 1
tion Directory,or available here:
:rc.c DIMS File wl.i.'l 'II Online Cp’i.'
Only those products bearihQ the UL CertiScation Mark should M considered
Certificabon and Follow-Up Service beirtQ covered by UL'a
The full SnapNrack Series 100 UL Test Report is available by sending requests to
appenggsnapnrack.cotn.Look for UL C«rtficeUon M&rk lh«product
Feo.R««ourcH com/r»iOL>rc«i
i77*7J2*atM
D#SlOA tr>dpr>ra<lceorri/cortfiouf«tor
www.*A»pfir*cli.<
Wh«c«lo Bujr comAvhere-io-buy
eentoct AtAopnrock-com
Solar Permit
Structural Criteria for Residential Flush-Mounted Solar Arrays
Please answer ALL of the Questions.
1.Roof Checks
A.Visual Review/Contractor’s Site Audit of Existiniz Conditions:
I Is the roof a sinele roof without a reroof overlay?
2)Does the roof structure appear structurally sound,without signs of alterations or significant structural
deterioration or sagging,as illustrated in Figure 1 ?
B.Roof Structure Data:
n Measured roof slooe Ce-e.6:12'):
21 Measured rafter soacina fcenter-to-center'):
3)Tvoe of roof framinc (rafter or manufactured truss'):
2.Solar Array Checks
A.Flush-mounted Solar Arrav:
1)Is the Diane of the modules (oanelsl oarallel to the olane of the roof?
21 Is there a 2"to 10"uao between underside of module and the roof surface?
31 Modules do not overhanc anv roof edees (ridses.hoos.eable ends,eavesl?
B.Do the modules plus support components weigh no more than:4 psf for photovoltaic arrays or 5 psf for solar thermal
arrays?
C.Does the arrav cover no more than half of the total roof area (all roof olanesl?
D.Are solar support component manufacturer's project-specific completed worksheets,tables with relevant cells
r\r \»/^K-Kacp/t r'ij1r‘iilotr»r rACnltc ‘att'ar'hpH‘7
E.Is a roof clan of the module and anchor lavout attached?(see Fieure 21
F.Downward Load Check (Anchor Lavout Checkl:
11 ProDOsed anchor horizontal soacins (see Fieure 21:
21 Horizontal anchor soacinc oer Table I:
31 Is DroDOsed anchor horizontal soacine less than Table 1 soacine?
G.Wind Uolift Check (Anchor Fastener Checkl:
11 Anchor fastener data (see Fieure 31:
a.Diameter of lae screw,haneer bolt or self-drilline screw:
b.Embedment deoth of rafter:
c.Number of screws oer anchor (tvolcallv onel:
d.Are 5/16"diameter lag screws with 2.5"embedment into the rafter used,OR does the anchor
fastener meet the manufacturer's guidelines?
YES
YES
3:12
24'
Rafter
YES
YES
YES
YES
YES
YES
YES
6'-0
6'-0
YES
5/16
2.5
1
YES
Permit Types
BLD ELE MEC PLM
CITY OF ANAHEIMXX
BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-51S3
Permit Number:BLD2021-04550
Issued:10/14/2021
INSPECTION REQUEST LINE:
(714)765-4626
Quarter Section;12
Site Address:217 N DALE AVE,ANAHEIM,CA 92801
Legal Description:N TR 3099 LOT 33
WORKER'S COMPENSATION DECLARATION:
WARNING;FAILURE TO SECURE WORKERS’COMPENSATION COVERAGE IS UNLAWFUL,AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES
AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000),IN ADDITION TO THE COST OF COMPENSATION,DAMAGES AS PROVIDED FOR IN
SECTION 3706 OR THE LABOR CODE,INTEREST,AND ATTORNEY'S FEES.
I hereby affirm under penalty of perjury one of the following declarations;
I have and will maintain a certificate of consent to self-insure for worker’s compensation,issued by the Director of Industrial Relations as provided for
by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued.
I have and will maintain worker's compensation insurance,as required by Section 3700 of the Labor Code,for the performance of the work for which
this permit is issued.My worker's Compensation insurance carrier and policy are:
Carrier:STATE COMPENSATION INSURANCE FUND
X
12/18/20219166694ExpirationDate:Policy No:
Phone No:Name of Agent:
I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to
the worker's compensation laws of California,and agree that,if I should become subject to the worker's compensation provisions of Section 3700 of
the Labor Code,I shall forthwith comply with those provisions.
10/14/2021KEVINPHAM
DateElectronicSignatureofApplicant
LICENSED CONTRACTORS DECLARATION:
I hereby affirm under the penalty of perjury that I am licensed under provisions of chapter 9 (commencing with Section 7000)of Division 3 of the
Business and Professions Code,and my license is in full force and effect.
10/14/2021BRIGHTPLANETSOLARINC
DateElectronicSignatureofContractor
LICENSE TYPE(S)EXPIRATION DATE
11/30/2022
NUMBER
1020761 CIO
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the