Loading...
1974-075RESOLUTION NO. 74R -75 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ANAHEIM AMENDING RATES, RULES AND REGULA- TIONS FOR THE SALE AND DISTRIBUTION OF ELEC- TRIC ENERGY AS ADOPTED BY RESOLUTION NO. 71R -478 AND AMENDED BY RESOLUTIONS NOS. 73R -25, 73R -373 AND 73R -531. WHEREAS, the City of Anaheim does distribute elec- tric energy to certain customers in Anaheim; and WHEREAS, all electric energy distributed by the City of Anaheim is purchased from the Southern California Edison Company; and WHEREAS, the Southern California Edison Company, on January 2, 1974, filed an application with the Federal Power Commission to increase its wholesale electric rates about 74% to cities such as Anaheim, such increase to be effective March 3, 1974; and WHEREAS, the Federal Power Commission can reject the filing, or suspend the filing in whole or in part up to five months, or accept the filing and make it effective March 17, 1974; and WHEREAS, Anaheim will probably not know until shortly before March 17, 1974, what action the Federal Power Commission will take on the Edison Company filing; and WHEREAS, an additional appropriation of about $1,245,000 per month will be required for purchased power in the electric utility budget when the wholesale rate increase becomes effective; and WHEREAS, Anaheim will experience an estimated revenue lag of $1,048,000 if the wholesale rates are increased March 17, 1974, unless Anaheim's retail electric rates are made effective by February 19, 1974; and WHEREAS, the Edison Company's wholesale electric rate application includes a fuel cost adjustment; and WHEREAS, Anaheim's Electric Rates, Rules and Regula- tions do not include a fuel cost adjustment schedule; and WHEREAS, the City Council has determined that Anaheim's retail electric rates shall be increased February 19, 1974, to avoid an estimated revenue lag of $1,048,000 if the wholesale rate increase becomes effective March 17, 1974 and to provide funds for additional appropriations to pay the wholesale power cost increase; and WHEREAS, the City Council has further determined that Anaheim's Electric Rates, Rules and Regulations shall include a fuel cost adjustment. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Anaheim that the rates, rules and regulations adopted by Resolution No. 71R -478 and amended by Resolutions Nos. 73R -25, 73R -373 and 73R -531 are hereby amended as follows, to wit: -1- CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 RATES, RULES AND REGULATIONS TABLE OF CONTENTS EFFECTIVE TITLE DATE PAGE NO. Title Page 11 -14 -71 i Table of Contents 2 -19 -74 ii 11 -14 -71 iii 11 iv Electric Utility Policy 11 -14 -71 1.0.1 Rate Schedules 9 -07 -73 2.0.1 Schedule FCA; Fuel Cost Adjustment 2 -19 -74 2.0.2 Schedule DS; Domestic Service 2 -19 -74 2.1.1 U 2.1.2 II 2.1.3 Schedule No. GS -1; General Service 2 -19 -74 2.2.1 11 11 11 0 11 2.2.2 Schedule No. GS -2; General Service 2 -19 -74 2.3.1 0 II 0 2.3.2 11 11 11 11 11 2.3.3 Schedule No. PC; Power- Connected Load Basis 2 -19 -74 2.4.1 11 11 II it It 11 2.4.2 Schedule No. PA; Power Agricultural 2 -19 -74 2.6.1 11 11 11 f1 11-14-71 2.6.2 11 H 2 -19 -74 2.6.3 Schedule No. LS -1; Lighting Street and Highway, City Owned System 1 -16 -73 2.7.1 Schedule No. LS -2; Lighting Street and Highway, Customer -Owned Installation 11 -14 -71 2.8.1 Schedule No. LO; Lighting Outdoor Area, City -Owned System 1 -16 -73 2.9.1 II 11 0 11 11 it 2.9.2 Schedule No. MS; Municipal Service Rules and Regulations 2 -19 -74 2.10.1 11 -14 -71 3.0.1 ISSUED BY Gordon Hoyt Effective By Resolution No. Page No. ii Dated Utilities Director Superseding Resolution No.73R -531 D&73 CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 EL -82 TITLE Rule No. 1; Definitions 11 11 It 11 11 11 ft 11 11 11 11 It 11 it It 11 II 11 11 11 Rule No. 2; Description of Service II 11 If 11 11 11 II II 11 11 II If If 11 II II II 11 It II IF 11 II 11 11 11 II 11 It II 11 11 11 11 It 11 11 It II 11 II II II 11 II II II 11 II II 11 41 II RATES, RULES AND REGULATIONS TABLE OF CONTENTS EFFECTIVE DATE 11 -14 -71 11 It ti 11 11 11 -14 -71 I1 11 1 11 It 11 11 11 11 Rule No. 3; Application for Service 11 -14 -71 Rule No. 4; Contracts 11 -14 -71 11 II II 11 41 Rule No. 5; Special Information Required On Forms 11 -14 -71 tt tl II It II Rule No. 6; Establishment and Re- Establishment of Credit 11 -14 -71 3.6.1 II u u 11 11 t 3.6.2 Rule No. 7; Deposits 11 -14 -71 3.7.1 Rule No. 8; Notices 11 -14 -71 3.8.1 Rule No. 9; Rendering Payment of Bilis 11 -14 -71 3.9.1 II II II 11 II II 11 11 It 3.9.2 Rule No. 10; Disputed Bilis 11 -14 -71 3.10.1 Rule No. 11; Discontinuance Restora- tion of Service 11-14-71 3.11.1 11 11 11 II 11 11 11 3 1 1 2 11 11 11 11 II II 11 3 1 1 3 ISSUED BY Gordon W. Hoyt Utilities Director (Continued) Page No. PAGE NO. 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 3.2.7 3.2.8 3.2.9 3.2.10 3.3.1 3.4.1 3.4.2 3.5.1 3.5.2 Effective by Resolution No. Dated Superseding Resolution No. 73R- -25 Datedl- 16 -73 CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 EL -82 TITLE RATES, RULES AND REGULATIONS TABLE OF CONTENTS Continued) Rule No. 12; Rates and Optional Rates 11 -14 -71 3.12.1 11 11 U 11 II 11 11 11 3 1 2 2 Rule No. 13; Temporary Service 11 -14 -71 3.13.1 Rule No. 14; Shortage of Supply and Interruption of Delivery 11 -14 -71 3.14.1 Rule No. 15.0; Line Extensions 11 -14 -71 3.15.0.1 11 11 II I/ 11 II 3.15.0.2 11 11 11 11 11 II 3.15.0.3 It It II 11 11 i1 3.15.0.4 II tl 11 11 II II 3.15.0. 5 Rule No. 15.1; Underground Extensions Within New Residential Subdivisions 11 -14 -71 3.15.1.1 11 11 ii 11 I, 1 3.15.1.2 Rule No. 16; Service Connections and Facilities on Customer's Premises II 11 11 11 11 11 11 11 11 II II 11 11 II 11 II 11 11 11 II 11 11 11 II II 11 11 II 11 II II 11 II II II II Rule No. 17; Meter Tests and Adjustment of Bills for Meter Error 11 11 11 If 11 11 Rule No. 18; Supply to Separate Premises and Resale 11 -14 -71 Rule No. 20; Replacement of Overhead with Underground Distribution Facilities 11 -14 -71 11 11 II 11 11 11 11 11 11 1I II II II 11 11 ISSUED BY Gordon +4 Hoyt Utilities Director 11 Page No. iv EFFECTIVE DATE PAGE NO. 11 -14 -71 3.16.1 1 f 3.16.2 3.16.3 3.16.4 3.16.5 3.16.6 3.16.7 11 -07 -73 3.17.1 3.17.2 3.18.1 3.20.1 3.20.2 3.20.3 ••01■11. Effective by Resolution No. Dated Superseding Resolution No. 73R -531 Dated11- -6 -73 CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 EL -82 Schedule No. FCA DS GS -1 GS -2 Title Page No. Fuel Cost Adjustment 2.0.2 Domestic Service 2.1.1 General Service 2.2.1 General Service 2.3.1 PC Power Connected Load Basis 2.4.1 PA Power Agricultural 2.6.1 LS -1 Lighting Street and Highway, City -Owned System 2.7.1 LS -2 Lighting Street and Highway, Customer -Owned Installation 2.8.1 r.n Lighting Outdoor Area, City -Owned System 2.9.1 MS Municipal Services 2.10.1 ISSUED BY Gordon W. Hoyt Utilities Director RATE SCHEDULES Page No 2 .0.1 Effective by Resolution No. Dated Superseding Resolution No. 73R -373 Dated 8 -28-7: CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 ISSUED BY Gordon Hoyt Utilities Director SCHEDULE FCA FUEL COST ADJUSTMENT A. APPLICABILITY Applicable to all areas served by the Utility and to all kwhr billed under all rate schedules as defined under the special conditions of the rate schedules. B. PURPOSE To provide for the adjustment of the Utility's electric rate schedule energy charges whenever a fuel cost adjust- ment has been applied to or is pending application to the City's wholesale rate. C. APPLICATION OF FUEL COST ADJUSTMENT The fuel cost adjustment amount per kilowatt hour sold shall be applied to service rendered on and after the effective date and continuing thereafter until the next such fuel cost adjustment amount becomes effective. The dollar amount to be added to or subtracted from each bill shall be the product of the total kilowatt hours for which the bill is rendered multiplied by the fugl cost adjust- ment amount per kilowatt hour sold. D. AMOUNT OF FUEL COST ADJUSTMENT The amount of the fuel cost adjustment shall be shown in this section. EFFECTIVE DATE AMOUNT PER KWHR February 19, 1974 .642 Page No. 2.0.2 Effective By Resolution No. Dated Superseding Resolution No. None Dated CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 El_ 82 ISSUED BY Gordon W. Hoyt Utilities Director SCHEDULE NO. DS DOMESTIC SERVICE APPLICABILITY Applicable to domestic service including lighting, heating, cooking, and power or combination thereof in a single family accommodation. PER METER RATES PER MONTH RATE A (11) and (16) Customer Charge $1.20 Energy Charge (to be added to Customer Charge) First 50 KWH, per KWH 5.20 Next 100 KWH, per KWH 4.04 Next 250 KWH, per KWH 2.50 Next 500 KWH, per KWH 2.11 All Excess KWH, per KWH 1.83 Minimum Charge: The minimum charge shall be the monthly Customer Charge. RATE 13 (12) Customer Charge $1.20 Energy Charge (to be added to Customer Charge) First 300 KWH, per KWH Rate A Next 400 KWH, per KWH 1.90 All Excess KWIH, per KWH 1.83 Minimum Charge: The minimum charge shall be the monthly Customer Charge. RATE C (10) Customer Charge: $1.20 Energy Charge (to be added to Customer Charge) First 300 KWII, per KWH Rate A Next 400 KWH, per KWH 1.90 All Excess KWH, per KWH 1.68 Minimum Charge: The minimum charge shall be the monthly Customer Charge. Page N 2.1.1 Effective by Resolution No. Dated Superseding Resolution No. 73R -531 Dated11 -6 -7' EL -82 CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 SPECIAL CONDITIONS A. Service voltage to a single family accommodation will be 120 volts or 120 -240 volts single phase. B. Rate Selection: C. Multi- family accommodations: Where all of the single family accommodations in an apartment house, court group, or similar multi- family accommodations are on a single meter, the customer shall have the following options: 1. To be billed on .General Service Schedule GS -1 or GS -2 or 2. To be billed on the applicable "A "B" or "C" rate of this schedule adjusted as follows: Customer Charge: No adjustment Energy Charge (to be added to Customer Charge): The kilowatt -hours for all blocks shall be multiplied by the number of single family accommodations on the meter. Minimum Charge: No adjustment. ISSUED BY Gordon W. Hoyt Utilities Director SCHEDULE NO. DS DOMESTIC SERVICE '�Cont nued5 Page No. 2.1.2 1. Rate B is applicable only where the consumer has an electric range and an electric water heater, both permanently installed and used both exclusively for all cooking and water heating on premises. a. Water heater shall be provided with an efficiently insulated storage tank and shall be equipped with two heating units each separately controlled by an individual thermostat. The thermostat control circuit shall be interconnected to cause one heat- ing unit to cut off when the other heating unit is on. b. Rate'B is closed to new customers as of November 14, 1971, and will expire on January 1, 1977. 2. Rate C is applicable only when all space heating is done electrically (resistance or heat pump). Rate C is closed to new customers as of January 1, 1974. (Continued) Effective by Resolution No. Dated Superseding Resolution No. 73R -373 Datedg -23 -73 CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 EL -82 ISSUED BY Gordon W. Hoyt Utilities Director Page No. 2.1 _1 SCHEDULE NO. DS DOMESTIC SERVICE (Continued) SPECIAL CONDITIONS (Continued) D. Fuel Cost Adjustment: The rates above are subject to adjustment as provided for in Schedule FCA. The applicable fuel cost adjustment billing factor set forth therein will be applied to all kwhr billed under this schedule. Effective by Resolution No. Superseding Resolution No. None Dated Dated EL -82 CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 APPLICABILITY Applicable to single and three phase general service including lighting and power. RATES *Not less than 20 KW SCHEDULE NO. GS -1 GENERAL SERVICE (Continued) PER METER PER MONTH RATE A (13) Customer Charge: Single phase $1.20 Three phase 2.20 Energy Charge (to be added to Customer Charge): First 400 KWII, per KWH 5.20 Next 800 KWH, per KWH 4.01 Next 1800 KWH, per K4`JH 3.24 All Excess KWH, per KWH 3.21 Minimum Charge: The minimum charge shall be the monthly Customer Charge. RATE B (14) and (19) Customer and Energy Charges: First 150 KWII per KW* of billing demand, per KWH Rate A Next 150 KWH per KW* of billing demand, per KWH 1.48 Over 300 KWH per KW* of billing demand, per KWH 1.04 Minimum Charge: The minimum charge shall be $1.00 per KW* of billing demand. ISSUED BY Gordon W. Hoyt Utilities Director Page No 2.2 •1 Effective by Resolution No. Dated Superseding Resolution No, 73R 531 Dated 11 EL -82 CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 SPECIAL CONDITIONS A. Service voltage per rules and regulations. B. Rate B is applicable when a demand meter is installed in accordance with Special Condition E. C. The billing demand in any month shall be the average kilo- watt input indicated or recorded by instruments to be supplied, owned and maintained by the City and at the City's expense upon the consumer's premises adjacent to the watt hour meter, in the 15 minute interval in which the consump- tion of electric energy is greater than in any other 15 minute interval in the month, but not less than either (1) 50% of the contracted for or connected load, or (2) 50% of the highest billing demand in the preceding eleven months, whichever is the greater. However, in no case shall the billing demand be less than the minimum billing demand. Billing demand shall be determined to the nearest 1 /10 KW. D. Where the demand is intermittent or subjected to violent fluctuations, the maximum demand may be based on a lesser interval. E. A maximum demand meter will be installed when, in the opinion of the Utilities Department, the customer's load and use characteristics indicate that the maximum demand may exceed 20 KW or when the customer's use exceeds 3,000 KWIH per month. F. Where the City installs the standard transformer capacity requested by a customer to serve separately an X -ray installa tion, the customer charge will be increased by $1.00 per kva of transformer capacity requested. G. No adjustment will be made for any temporary reduction in load. Any customer who resumes service within twelve months must pay all charges that would have been billed had service been continuous. H. Fuel Cost Adjustment: The rates above are subject to adjustment as provided for in Schedule FCA. The applicable fuel cost adjustment billing factor set forth therein will be applied to all kwhr billed under this schedule. SCHEDULE NO. GS -1 GENERAL SERVICE (Continued) Page No 2.2.2 ISSUED BY Gordon W. Hoyt Effective by Resolution No. Dated Superseding Resolution No. 71R 478 Datedl0 26 -7 Utilities Director CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 EL -82 APPLICABILITY Applicable to single and three phase general service including lighting and power. RATES (21) Demand Charge: First 200 KW or less of billing demand $260.00 Next 1800 KW of billing demand per KW 1.05 Next 8000 KW of billing demand per KW .90 All Excess KW of billing demand, per KW .75 Energy Charge (to be added to Demand Charge): First 150 KWH per KW* of billing demand First 30,000 KWH, per KWH Balance of K1 ^7H, per KWH Next 150 KWH per KW* of billing demand All Excess KWH, per KWH Minimum Charge: The monthly minimum charge shall be the monthly demand charge *Not less than 200 KW. SPECIAL CONDITIONS SCHEDULE NO. GS -2 GENERAL SERVICE A. Service voltage per rules and regulations. Page No. 2.3.1 PER METER PER MONTH 2.39G 1.72G 1.36G 1.03G B. Billing Demand: The billing demand in any month shall be the average kilowatt input indicated or recorded by instruments to be supplied, owned, and maintained by the City and at the City's expense upon the consumer's premises adjacent to the watt -hour meter, in the 15 minute interval in which the consumption of elec- tric energy is greater than in any other 15 minute interval in the month, but not less than either (1) 50% of the con- tracted for or connected load, or (2) 50% of the highest billing demand in the preceding eleven months, whichever is the greater. However, in no case shall the billing demand be less than 200 KW. Billing demand shall be determined to the nearest KEW Whenever the measured maximum demand has exceeded 400 KW for three consecutive months and thereafter until it has fallen below 300 KW for 12 consecutive months, a 30 minute interval will be used. Where the demand is intermittent or subjected to violent fluctuations, the maximum demand may be based on a shorter interval. ISSUED BY Gordon W. Hoyt Utilities Director (Continued) Effective by Resolution No. Dated Superseding Resolution No. 73R -531 Datedll -6 -73 EL -B2 CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 Page No. 2.3.2 SCHEDULE NO. GS -2 GENERAL SERVICE (Continued) SPECIAL CONDITIONS (Continued) C. Power Factor Adjustment: The charges will be adjusted each month for the power factor as follows: The charges will be decreased by 20 cents per kilowatt of measured maximum demand and will be increased by 20 cents per kilovar of reactive demand. However, in no case shall the kilovars used for the adjustment be less than one -fifth the number of kilowatts. The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar -hours to the kilowatt- hours. Demands in kilowatts and kilovars shall be determined to the nearest unit. A rachet device will be installed on the kilovar-hour meter to prevent its reverse opera- tion on leading power factor. D. Voltage Discount: The charges before power factor adjustment will be reduced by 3% for service delivered and metered at voltages of from 2 to 10 KV; by 4% for service delivered and metered at volt- ages of from 11 KV to 50 KV; and by 5% for service delivered and metered at voltages from 50 KV; except that when only one transformation from a transmission voltage level is involved, a customer normally entitled to a 3% discount will be entitled to a 4% discount. E. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustment will be made for a temporary discontinuance of service. Any customer prior to resuming service within twelve months after such service was discontinued will be required to pay all charges which would have been billed if service had not been discontinued. ISSUED BY Gordon W. Hoyt Utilities Director (Continued) Effective by Resolution No. Dated Superseding Resolution No. 71R -472 Dated10 -26 -71 EL -82 CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 MISsosur SPECIAL CONDITIONS (Continued) F. Fuel Cost Adjustment: SCHEDULE NO. GS -2 GENERAL SERVICE (Continued) Page No. 2.3.3 The rates above are subject to adjustment as provided for in Schedule FCA. The applicable fuel cost adjustment billing factor set forth therein will be applied to all kwhr billed under this schedule. ISSUED BY Gordon W. Hoyt Effective by Resolution No. Dated Utilities Director Superseding Resolution No. None Dated CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 EL-82 APPLICABILITY ISSUED BY Gordon W. Hoyt Utilities Director SCHEDULE NO. PC POWER CONNECTED LOAD BASIS Page No 2 .4 .1 Applicable to all single or three phase general power service, no lighting. This schedule is closed to new customers as of November 14, 1971. RATE (22) First 100 KWH per HP of connected load per month First 100 KWH 5.50 Excess KWII 4.674 Next 100 KWH per HP of connected load per month All KWH 2.37 All Excess KWH 1.88 Minimum Charge: $1.20 per HP of connected load per month. But in no case shall the minimum charge be less than the charges for 2 HP, single phase or the charges for 3 HP, three phase. SPECIAL CONDITIONS A. Service voltage per rules and regulations. B. Connected load is the sum of the rated capacities of all the consumer's equipment that it is possible to connect to the City's lines at the same time, determined to the nearest 1 /10 HP. 746 watts equivalent to 1 HP. C. Whenever, upon test, equipment under normal operating con- ditions is found to be delivering more than 125 per cent of its capacity as indicated by its nameplate rating, the City may disregard the nameplate rating and base its charges upon the output as calculated from test. Equipment which is billed on a basis in excess of its nameplate rating in accordance with this special condition shall be tested upon notification by the consumer of a permanent change in operating conditions. (Continued) Effective by Resolution No. Dated Superseding Resolution No. 73R -531 Dated 11 -6 -73 EL -82 CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 SCHEDULE NO. PC Page No. 2.4.2 POWER CONNECTED LOAD BASIS (Continued) SPECIAL CONDITIONS (Continued) D. Where X -ray apparatus is served under this schedule, the minimum charge applicable thereto shall be as follows: 1. Where X -ray apparatus is metered separately from the other load: $3.00 per month, except where the transformer capacity is installed exclusively to serve the X -ray apparatus, the minimum charge will be $1.00 per month per KVA of such capacity but not less than $3.00 per month. 2. Where X -ray apparatus is metered in combination with other load: $1.00 per month per KVA of X -ray apparatus capacity as established by the City of Anaheim. E. No adjustment in mi charge will be made for any tem- porary reduction of connected load. F. Fuel Cost Adjustment: The rates above are subject to adjustment as provided for in Schedule FCA. The applicable fuel cost adjustment billing factor set forth therein will be applied to all kwhr billed under this schedule. ISSUED BY Gordon W. Hoyt Effective by Resolution No. Dated wramromeme Uti 1 i ties Director Superseding Resolution No. 71R- 47R_Dated 10 -26 -77 CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 EL' -82 APPLICABILITY RATE (24) ISSUED BY Gordon W. Hoyt Utilities Director SCHEDULE NO. PA POWER AGRICULTURAL Page No. 2.6 .1 Applicable to power service for general agricultural purposes, or for general water or sewerage pumping. ENERGY CHARGE IN ADDITION TO SERVICE CHARGE RATE PER KWH FOR CONSUMPTION PER HP PER YEAR Size of Annual Service 1st 1000 2nd 1000 All over 2000 Installation HP Charge per HP KWH KWH KWH 2 to 4.9 $10.60 2.89 1.50 1.10 5 to 14.9 9.60 2.69 1.50 1.10 15 to 49.9 9.00 2.59 1.50 1.10 50 to 99.9 8.40 2.49 1.50' 1.10' 100 and over 7.80 2.394 1.50 1.10 Minimum Charge: The anIYual minimum charge shall be thc =vice charge, but in no case will the total annual service charge be less than $21.20 for single phase service nor less than $31.80 for three phase service. SPECIAL CONDITIONS A. The rate applies to service rendered at 240 or 480 volts at the option of the consumer. 746 watts shall be equivalent to 1 HP. B. The agricultural year upon which this rate is based shall consist of twelve consecutive months, the start of the first month being the first regular meter reading taken during the month of May and the end of the last month being the last regular meter reading taken during the month of April of the succeeding year. C. The service charge is payable in six monthly installments during the months of May to October inclusive. Consumers, whose normal use of energy does not occur within the period May through October, may elect, if satisfactory to the City of Anaheim, another six months within which to pay the ser- vice charge, provided such period shall not begin later than the month of October. The energy charge is payable monthly as energy is used. (Continued) Effective by Resolution No. Dated Superseding Resolution No. 73R -531 Dated11 -6 -73 CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 SPECIAL CONDITIONS (Continued) 1. 2. ISSUED BY Gordon W. Hoyt Utilities Director EL -82 SCHEDULE NO. PA POUER AGRICULTURAL (Continued) H. Change of Connected Load: Where there is an increase or decrease in connected load during the agricultural year, no adjustments in billing to date of change will be made. For the period subsequent to date of change, billing shall be made on the following basis: Any remaining service charge installments shall be based on the new connected load. Energy charge billing will be based on the new connected load using the full annual blocks less the adjusted kilowatt -hour use to date of change. This adjustment is determined by multiplying the kilowatt -hours to date of change by the ratio of the new connected load to the old connected load. I. Fuel Cost Adjustment: The rates above are subject to adjustment as provided for in Schedule FCA. The applicable fuel cost adjustment billing factor set forth therein will be applied to all kwhr billed under this schedule. Effective by Resolution No. Dated Superseding Resolution No. 71 R -478 Dated 10-26 -7 Page No. 2.6.3 EL -82 CITY OF ANAHEIM Electric Utility Post Office Box 3222 Anaheim, California 92803 APPLICABILITY ISSUED BY Gordon W. Hoyt Utilities Director SCHEDULE NO. MS MUNICIPAL SERVICE RATE (15) All KWH per meter per month 2.0 per KWH SPECIAL CONDITIONS A. Fuel Cost Adjustment: Page No 2.10.1 Applicable to single or three phase service where the City of Anaheim owns, operates and maintains the electrical equipment. The rates above are subject to adjustment as provided for in Schedule FCA. The applicable fuel cost adjustment billing factor set forth therein will be applied to all kwhr billed under this schedule. Effective by Resolution No. Dated Superseding Resolution No. 73R -531 Dated 11-6-73 /kw BE IT FURTHER RESOLVED that the Rates, Rules and Regulations adopted by this resolution,except Schedule No. PA Power Agricultural (Rate 24), shall go into effect February 19, 1974. BE IT FURTHER RESOLVED that Schedule No. PA as adopted by this resolution shall go into effect on all bills rendered to consumers reflecting consumption for any complete billing period commencing on or after February 19, 1974. THE FOREGOING RESOLUTION is approved and signed by me this 19th day of February, 1974. ATTEST: CITY CLERK OF THE CITY OF ANAHEIM STATE OF CALIFORNIA COUNTY OF ORANGE ss. CITY OF ANAHEIM r OR OF THE CITY OF ANAHEIM I, ALONA M. FARRENS, City Clerk of the City of Anaheim, do hereby certify that the foregoing Resolution No. 74R -75 was passed and adopted at a regular meeting of the City Council held on the 19th day of February 19 74, by the following vote of the members thereof: AYES: COUNCILMEN: Stephenson, Sneegas, Pebley, Thom and Dutton NOES: COUNCILMEN: None ABSENT: COUNCILMEN: None AND I FURTHER CERTIFY that the Mayor of the City of Anaheim approved and signed said Resolution on the 19th day of February 19 74 IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the City of Anaheim this 19th day of February 19 74 (SEAL) CITY CLERK OF THE CITY OF ANAHEIM I, ALONA M. FARRENS, City Clerk of the City of Anaheim, do hereby certify that the foregoing is the original of Resolution No. 74R -75 duly passed and adopted by the Anaheim City Council on February 19, 1974. -2- City Clerk