Loading...
96-097 RESOLUTION NO. 96R-97 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ANAHEIM ADJUSTING DEVELOPMENT FEES ESTABLISHED PURSUANT TO CHAPTER 17.30 OF THE ANAHEIM MUNICIPAL CODE (INTERIM DEVELOPMENT FEES - ANAHEIM STADIUM BUSINESS CENTER) WHEREAS, Chapter 17.30 of the Anaheim Municipal Code established certain development fees imposed upon development within the Anaheim Stadium Business Center Area; and WHEREAS, the purpose of the fees is to provide Anaheim Stadium Business Center infrastructure, and the fees will be used to finance street improvements and fire services; and WHEREAS, the City Council hereby determines that the types of development in the Anaheim Stadium Business Center increase and the need for street improvements and fire service in the area; and WHEREAS, Section 17.30.060 of Chapter 17.30 of the Anaheim Municipal Code authorizes the City Council periodically to adjust the amounts of the fees in accordance with the construction cost index for construction costs in the Los Angeles area as published in the Engineering New-Records Construction Cost Index ("ENR-CCI"); and WHEREAS, the City Council hereby finds that since adoption of Chapter 17.30, the ENR-CCI has risen 0.21% from April 1995 to April 1996 and, based thereon, the City Council desires to increase the Chapter 17.30 fees accordingly; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Anaheim as follows: 1. The fee set forth in the various subsections of Section 17.30 of Chapter 17.30 of the Anaheim Municipal Code shall, upon their effective date as set forth below, be as follows: 17.30.020a ...................... $4.98/ sq. ft. 17.30o020b ...................... $1.29/ sq. ft. 17.30.020c ...................... $2.52/ sq. ft. 2. The fee established herein shall become effective on the sixtieth (60th) day following the date of adoption of this Resolution and shall thereafter supersede the corresponding fee previously adopted by prior resolution. THE FOREGOING RESOLUTION is approved and adopted by the city Council of the City of Anaheim this 11th day of June , 1996. 0018819.01\mslaught\April 29, 1996 STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss. CITY OF ANAHEIM ) I, LEONORA N. SOHL, City Clerk of the City of Anaheim, do hereby certify that the foregoing Resolution No. 96R-97 was introduced and adopted at a regular meeting provided by law, of the Anaheim City Council held on the 11th day of June, 1996, by the following vote of the members thereof: AYES: MAYOR/COUNCIL MEMBERS: Tait, Felhaus, Lopez, Daly NOES: MAYOR/COUNCIL MEMBERS: Zemel ABSENT: MAYOR/COUNCIL MEMBERS: None AND I FURTHER CERTIFY that the Mayor of the City of Anaheim signed said Resolution No. 96R-97 on the 11th day of June, 1996. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of Anaheim this 1 lth day of June, 1996. CITY CLERK OF THE CITY OF ANAHEIM (SEAL) I, LEONORA N. SOHL, City Clerk of the City of Anaheim, do hereby certify that the foregoing is the original of Resolution No. 96R-97 was duly passed and adopted by the City Council of the City of Anaheim on June 1 lth, 1996. 1. SERVICE FEES: 3! SERVICE FEE DEPOSITS: ( 4. ASSESSMENTS: A. Traffic/Parking Studies ....... $ 71.00/hr. A. Traffic Studies: A. Sewer/Drainage: See//2 B. Detour Plans ............... $ 71.00/~r. 1. Less than 100 Peak Trips ..... $ 710.00 B. Foothill/Eastern Trans. Corridor See//3 C. Plan Checking: Normal ...... $ 66.00/hr. 2. 100-250 Peak Trips ........... $2,130.00 C. Signal Assessment Fees: Overtime ..... $ 99.00/hr. 3. Over 250 Peak Trips .......... $2,840.00 1. Residential Unit ............... $ 86.00/unit D. Const. Inspect: Normal ....... $ 56.00/~r.*A B. Parking Studies ............... $ 284.00 2. Lodging ..................... $ 86.00/unit Overtime ..... $ 84.00/hr.*A C. Traffic Signal (intemection) ....... $1,550/1,050 3. Retail Sales (to 50,000 GSF) ....... $ 428/1000gsf E. Street Trees ................ $ 2.43/F.F. D. Design Studies: 4. Retail Sales (>50,000 GSF) ........ $ 312/1000gsf F. Hillside Tree Inspection: 1. Sewer/Hydrology Study ...... $ 700.00 5. Commemial, Churches ......... $190/1000gsf Up to 100 Units ......... $ 71.00/tract 2. Right-of-Way Sketches ....... $ 150.00 6. Medical Facilities ............. $ 312/1000gsf Over 100 Units add ..... $ 36.00/100 3. Specific Plan Reviews ........ $ 350.00 7. Industrial Buildings ........... $ 74/100O~sf G. T.V. Sewer Inspection ....... $185.00/hr. 4. Misc. Technical Reviews ..... $ 700.00 8. Outdoor Storage Areas ......... $ 32/lO0Ogsf H. Sewer~-Iydrology Studies ..... $ 66.00/hr. E. Plan Checking/Inspection #1 D. Santa Ana Canyon Road: I. Right-of-Way Sketches ....... $ 66.00/fu. 1. Tracts (includes Sewer. Street. Grading 1. Single Family Detached ........ $1,379/unit J. Specific Plan Reviews ........ $ 66.00/hr. and Storm Drain Improvement Plans): 2. Condominiums/Apts ........... $1,190/unit K. Misc. Technical Reviews ..... $ 66.00/hr. a. Single Family ............ $ 320/200 Lot 3. Commercial .................. $ .679/s.t L. Real Property Services ........ $ 66.00/hr. (minimura $5.000/3.5001 M. Contract Administration ..... $ 64.00/hr. b. Multi-Family ............ $ 110/75 Unit 4. Institutional .................. $ .443/s.£ · (minimum $5,000/3,500) 5. Industrial .................... $ .207/s.f. N. Blueprinter Certification Fee... $200.00 2. Parcel Maps (map only) ........ $2,000/N.C. E. Stadium Area Fee ................ $ 9.08/gsf*4 O. Sidewalk Waiver ............ $190.00 3. Lot Line Adjustment Plat ..... $ 850/N.C. F. Citywide Transportation Fees: P. Final Map Mylars ............ $ 90.00/sheet 4. Special Projects: 1. Single Family ................. $ 597/unit a. Street/Storm Drain 2. Apartment ................... $ 405/unit 2. PERMIT FEES: (min. $1200/7501 ............ $ 3.20/3.00L.F. 3. Hotel/Motel Room ............. $ 453/unit b. Sewer (min. $1200/11001 ..... $ 3.20/4.85L.F. 4. General Office ................. $ 1.40/gsf A. Right-of-Way Construction: 5. Flatland Grading Plan: 5. Retail ........................ $ 1.70/gsf 1. Public Utilities ............ $ 78.00 a. Less than 500 c.y ......... $ 300/plan 6. Industrial .................... $ 0.34/gsf 2. Single Family (Residential) .... $ 43.00 b. 500 c.y. or more .......... $1,900/500Plan 7. Church ....................... $ 0.97/gsf 3. Commercial/Industrial ...... $155.00 6. Hillside Grading Plan (includes Hydrology Stody): 8. Hospital ...................... $ 0.97/gsf B. Grading: a. Less than 100 c.y. $ 300/plan 9. Child Care- Dryby ............. $ 2.79/gsf 1. Flatland ................. $ 87.00 b. 100-10,000 c.y. $ 2,500/750Plan 10. School ........................ $ 0.58/gsf 2. Hillside .................. $104.00 c. 10,001-100,000 c.y. $ 3,500/200OPlan 11. Peak Hour Trip End ............. $ 687/txip C. Excavation Deposit (refundable less costs): d. 100,001-1,000,000 c.y. $ 4,500/4000Plan 1. Single Family ($150 rain) ..... $ See #2 e. Over 1,000,000 c.y. $ 6,000/6000Plan * 1 - Inspection deposit required prior to project 2. Commercial ($300 rain) ....... $ See #2 7. Reversion to Acreage ........ $ 700/N.C. approval 3. Industrial ($300 rain) ......... $ See//2 8. Certificate of Compliance .... $ 500/N.C. *2 - Contact Development Services/Design at: 4. Water Service ~$5oo rain) ..... $ See #2 9. Certificate of Correction ..... $ 200/N.C. (7141 254-4431/5176 5. Sewer Laterals t$500 min) ..... $ See #2 F. Abandonment ................ $ 800.00 *3 - Contact Traffic Engineering at: 6. Monitoring Well ($500min/... $ See#2 G. Encroachment ............... $ 800.00 (7141254-5183 D. Transportation: H. NPDES Water Quality *4 - For fee adjustment contact Traffic Engineering 1. Annual Permit ............. $ 90.00/ea. Management Plans ............ $ 300.00 at (7141 254-5183 2. Trip ..................... $ 16.00/ea. Note: These rates are subject to change · A. Rates do not apply for contracted inspect.svcs.