Loading...
2785 W STANLEY PL (2)Permit Types BLD I ELE I MEC PLM X I X Permit Number: BLD2015-06828 Issued: 12/23/2015 INSPECTION REQUEST LINE: (714) 765 - 4626 C 200 Quarter be on: 19 (714) 765 - 5153 Site Address: 2785 W STANLEY PL Legal Description: N TR 2775 LOT 28 Project Description: Residential Remodel: Install 600 sq. ft. of drywall in family room with electrical. EIM Valuation: $600.00 Construcion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 307.50 People Associated with Project: Owner DIANA HELEN LAMPSON TR 2785 STANLEY PL ANAHEIM CA 92801-4826 Permit Applicant DIANA H LAMPSON Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Receptacle, switches, lights 26 a The permit shall expire by limitation.and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbid_permit_combo Mechanical Fixtures Qty P�PHEIM Cq< City of Anaheim o� �o Building Division F z u ' �OUn'DED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been signed: Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildin Ins esti s I I E^ i" I R Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) INU Ip i FTF n 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned: DATE- It& 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless Maned offi Sewer Water Engineering Backflow (Testable Only) Water Service