Permit Number: BLD2018-00344
Issued:01/25/2018 CITY OF ANAHEIM
INSPECTION REQUEST LINE: BUILDING DIVISION
(714) 765 - 4626 200 S. ANAHEIM BLVD.
Quarter Section: 98
(714) 765 - 5153
Site Address: 318 E WAKEFIELD AVE
Legal Description: N TR 3535 LOT 10
Project Description: Reroof: Remove existing material, resheath as necessary, and install 64 squares of composition shingles
over apartments.
Valuation:
$18,500.00
Constwcion Types:
WA, ,
Fire Spdnklered?
No
Cool Roof
No
Total Fees paid for Permit:
349.23
People Associated with Project:
Owner XU SHAOLI TR 13337 SOUTH ST UNIT 256 CERRITOS CA 90703
Contractor REX ROOFING INC 1236 CRENSHAW BLVD LOS ANGELES CA 90019 0000
Permit Applicant INKOOKAHN
Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Type Mechanical Fixtures Oty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. ibid parmit_combo
�PHEIM Cq
Cityof Anaheim DF r <J�O
Building Division F i
• �OVrVDED ts�n
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
t
Plumbing Final
J
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765514DATE:
INSPECTION I
DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lie. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
ICOAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (7147655153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compactlon/Membrans Reinf.)
Floor (JolsUGlyders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Relnf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagatlon Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. & Fire)
Insulation (Sound/Energy)
)o not tape or plaster until the following applicable items have been sig,
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Ganatuollaa-
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service