Loading...
407 S BUSH ST (2)r Permit Permit Number: BLD2017-00958 Issued: 03/08/2017 C INSPECTION REQUEST LINE: (714) 765 - 4626�I Quarter Section: 93 Site Address: 407 S BUSH ST Legal Description: LORELEI TR BLK D LOT 14 EIM Project Description: Reroof: Tear off existing material, resheath as necessary, and install 3 squares of composition shingles over detached garage only. . Valuation: $1,000.00 Construcion Types: WA, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 279.96 People Associated with Project: Owner HAI V PHAN 411 S BUSH ANAHEIM CA 92805-4133 Permit Applicant HAI PHAN Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbid_permit_combo '; ! t �•'� P�PNEiM �qC Cityof Anaheim o� �o Building Division F z > �OGNDED �$y^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS I DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned: Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas I PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical In .y(�Q2nd WiAI /j� I I I\ E U Floor Shear Roof (Sheathing/Diaphragm/Frame) S REC RFC T I ON Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) 11VV I UV1Vlr—,Lr_ Rough Duct (Mechanical) ' Rough Mechanical DATE: Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections , Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) , Grease Interceptor (Do not backfill unless sioned off) Sewer Water Engineering Backflow (Testable Only) Water Service