1409 N ROUNDTREE LN (2)Permit Types
ELE MEC PLM
X ☑X
ermit Number: BLD2023-05963
Issued: 02/21/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 16
Site Address: 1409 N ROUNDTREE LN, Anaheim, CA 92801
Legal Description: N TR 7658 BLK LOT 51
APN: 07074467
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765-5153
OF ANAHEIM CALIFOR
RAOUNDED 1851
Project Description: Residential Remodel: Replace damaged roof and framing, replace all interior drywall and (4) windows. Remove and
replace roof mounted HVAC and fixtures in kitchen and (2) bathrooms due to fire damage. REF: INV2023-00159
60
Living Area:
Garage Area:
Carport Area:
Balcony/ Deck Area:
Cool Roof:
People Associated with Project:
Number of Stories:1 Valuation:
Construction Types:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permit:
Contractor DRYMASTER 26021 PALA SUITE 150201312091017577985 MISSION VIEJO, CA 92675
Permit Applicant Samuel Allensworth
Owner RAMIREZ. ADRIAN & HAZZEL 1409 N ROUNDTREE LN
Type Electrical Fixtures
Receptacle, switches, lights
200,000.00
VB
No
3,723.61
Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
63 Bath Tub 1 Condenser
Kitchen Sink 1 Heating Appliances, including vent
Lavatory
Water Closet
Heating/Cooling Coil2
2
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
FINAL INSPECTIONS DATE INSPECТОК
All applicable items below must be signed before utilities are releasedCity of Anaheim
Building Division
ANAHEI
M CALIFO
Final Gas Test
OUNDED 18
Electrical Final
Plumbing Final
Mechanical Final
6/1/25 DG
DG
110/25 DG
22 DG
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Do not occupy this building until the final inspections have been made.
INSPECTION DATE INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
signed:
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)9/25/2 TDo not cover or conceal the work below until the following applicable items have
been signed:
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765-4591
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
COA/Migation Measures
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed 6/0/ D
PARTIAL INSPECTIONS
Building Inspections
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
9/25/24 DT
Mechanical Inspections
8/.4/p4 DT
89/,5/24 OT
P/BYD10/10/04 0
Vale Di
T
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sianed off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service
Plumbing Inspections
estalia SC
110/29124 Electrical Inspections