Loading...
1409 N ROUNDTREE LN (2)Permit Types ELE MEC PLM X ☑X ermit Number: BLD2023-05963 Issued: 02/21/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 16 Site Address: 1409 N ROUNDTREE LN, Anaheim, CA 92801 Legal Description: N TR 7658 BLK LOT 51 APN: 07074467 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765-5153 OF ANAHEIM CALIFOR RAOUNDED 1851 Project Description: Residential Remodel: Replace damaged roof and framing, replace all interior drywall and (4) windows. Remove and replace roof mounted HVAC and fixtures in kitchen and (2) bathrooms due to fire damage. REF: INV2023-00159 60 Living Area: Garage Area: Carport Area: Balcony/ Deck Area: Cool Roof: People Associated with Project: Number of Stories:1 Valuation: Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: Contractor DRYMASTER 26021 PALA SUITE 150201312091017577985 MISSION VIEJO, CA 92675 Permit Applicant Samuel Allensworth Owner RAMIREZ. ADRIAN & HAZZEL 1409 N ROUNDTREE LN Type Electrical Fixtures Receptacle, switches, lights 200,000.00 VB No 3,723.61 Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty 63 Bath Tub 1 Condenser Kitchen Sink 1 Heating Appliances, including vent Lavatory Water Closet Heating/Cooling Coil2 2 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. FINAL INSPECTIONS DATE INSPECТОК All applicable items below must be signed before utilities are releasedCity of Anaheim Building Division ANAHEI M CALIFO Final Gas Test OUNDED 18 Electrical Final Plumbing Final Mechanical Final 6/1/25 DG DG 110/25 DG 22 DG Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Do not occupy this building until the final inspections have been made. INSPECTION DATE INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been signed: Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing)9/25/2 TDo not cover or conceal the work below until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Water Engineering (714) 765-4591 Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) COA/Migation Measures Building Final (714 765-5153) Last Inspection-Final Only After Above Completed 6/0/ D PARTIAL INSPECTIONS Building Inspections 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) 9/25/24 DT Mechanical Inspections 8/.4/p4 DT 89/,5/24 OT P/BYD10/10/04 0 Vale Di T Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sianed off) Sewer Water Engineering Backflow (Testable Only) Water Service Plumbing Inspections estalia SC 110/29124 Electrical Inspections