Loading...
238 W WILKEN WAYPermit Types BLD LE MEC PLM X X Permit Number: BLD2024-04243 Issued: 08/14/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 89 Site Address: 238 W WILKEN WAY, Anaheim, CA 92802 Legal Description: N TR 2520 BLK LOT 93 APN: 23309407 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 766 - 5153 Project Description: Residential Photovoltaic System - Microinverters (without ESS) Living Area: Garage Area: CarportArea: Balcony / Deck Area: Cool Roof: Number of Stories: oo\v- Valuation: Construction Types: Occupancy Groups: Fire Spnnklered: Total Fees paid for Pernik: i 5 20 SD 12,585.00 172.00 People Associated with Project: Contractor COMPLETE SOLAR INC 2500 EXECUTIVE PKVVY SUITE 450 SUITE 504 201503171224072990 LEHI. UT 94404 Permit Applicant Fastens Varela Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures Qty Microinverter 9 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNf"ElM Dq` City of Anaheim OF i0 Building DIVISIOn .' i > �DV'NV DED toy^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) SetbacklFormslTrenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoistlGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned let Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mee & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service