604 S PHILADELPHIA STPermit Types
SLIDELE MEC I PLM
X
Permit Number: BLD2010-04144
Issued: 11 /04/2010
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 84
Site Address: 604 S PHILADELPHIA ST
Legal Description: N TR 373 BLK D LOT 2
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Patio cover: Construct 396 St. freestanding carport on rear of property. Work started prior to pulling a
permit. (Ref: BLD2005-03549)
Valuation:
$6,000.00
Construcion Types:
VB, ,
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
86.20
People Associated with Project:
Owner CARLOS A LOPEZ 604 S PHILADELPHIA ST ANAHEIM CA 92805-4743
Permit Applicant CARLOS LOPEZ
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures City
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work.
City of Anaheim
Building Division
Do not occupy this building until the final inspections have been made.
BUILDING PERMIT DOES NOT AUTHORIZE ELECTRICAL, PLUMBING, OR
MECHANICAL INSTALLATIONS - SEPARATE PERMITS ARE REQUIRED.
INSPECTION I DATE I INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have
been signed:
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
OJ i(
Mechanical (Groundwork)
Electrical (Underground Conduit)
�✓ I I
4
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdem)
Underfloor Insulation (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
let Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Roof(Sheathing/Diaphragm/Frame)
Masonry (Reinf.IBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Framing (Only after Plbg., Ele., Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele., Mec. & Plbg.)
Interior Lath
Exterior Lath
GENERAL ITEMS
Electrical Service Meter
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mee.)
Sewer
8 U
G-
Water Engineering Backflow (Testable Only)
Water Service
All applicable items below must be signed before utilities will be released.
FINAL INSPECTIONS
DATE
INSPECT R
Final Gas Test
G
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control P141 Mono
Engineering/Grading Final p1417ss.su6
Fire Dept. Final (714) 765.5041
Fire Sprinkler Final (714) 765-5041
Water Engineering (714) 765.4591
Sub List/Business License (714) 765-5194
Zoning (714) 765-5139
Building Final (Last Inspection -
Only After Above Complete)
FINAL INSPECTION must be approved by the Building Division.
PARTIAL INSPECTIONS
Building Inspections PERMIT EXPIRED
INSPECrLnN
NOT'COMP{ETeD
Mechanical Inspections
f—furri! Ins ections e/_ r A /
3 (( Lv v-t- ar s4L' V-&I � 6f- C-
Electrical Inspections
Permit Backs Master-2008.xls