Loading...
986 S SEDONA LN (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2024-02086 Issued: 04/24/2024 www.anaheim.net/bu i Iding (714)765-4626 Quarter Section: 226 Site Address: 986 S SEDONA LN, ANAHEIM, CA 92808 Legal Description: N TR 14077 BLK LOT 19 APN: 51402115 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 •5153 Project Description: Residential Remodel: Changeout (27) retrofit windows and (1) patio door Living Area: Garage Area: Carport Area: Balcony I Deck Area: Cool Roof: Numl ar of Stones: 1 Valuation: Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: 24,583,00 N/A 562.20 People Associated with Project: Contractor HOME DEPOT U S A INC DBA THE HOME DEPO P O BOX 105451 ATTN LICENSE MANAGEMENT 200408130950507570 ATLANTA. GA 9280 Permit Applicant Jeffrey Peo Owner VARTANIAN, BLAKE JR 8 KRISTINA R 986 S SEDONA LN Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�p,li__ City of Anaheim O� iO Building DIVISION i > �ovNDEO 1a5^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subhoor or pour Floor slab until the follwing applicable items have beensianed Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed let Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (ReinfdBond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items nave been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New QQUUDMUQIL- Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor fDo not backfill unless ginned off) Sewer Water Engineering Backflow (Testable Only) Water Service