986 S SEDONA LN (2)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-02086
Issued: 04/24/2024
www.anaheim.net/bu i Iding
(714)765-4626
Quarter Section: 226
Site Address: 986 S SEDONA LN, ANAHEIM, CA 92808
Legal Description: N TR 14077 BLK LOT 19
APN: 51402115
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 •5153
Project Description: Residential Remodel: Changeout (27) retrofit windows and (1) patio door
Living Area:
Garage Area:
Carport Area:
Balcony I Deck Area:
Cool Roof:
Numl ar of Stones:
1 Valuation:
Construction Types:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permit:
24,583,00
N/A
562.20
People Associated with Project:
Contractor HOME DEPOT U S A INC DBA THE HOME DEPO P O BOX 105451 ATTN LICENSE MANAGEMENT 200408130950507570 ATLANTA. GA 9280
Permit Applicant Jeffrey Peo
Owner VARTANIAN, BLAKE JR 8 KRISTINA R 986 S SEDONA LN
Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�p,li__
City of Anaheim O� iO
Building DIVISION i
>
�ovNDEO 1a5^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subhoor or pour Floor slab until the follwing applicable items have beensianed
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (GroundlUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
let Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (ReinfdBond BeamlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele.. Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items nave been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
QQUUDMUQIL-
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
fDo not backfill unless ginned off)
Sewer
Water Engineering Backflow (Testable Only)