Loading...
512 N PARKWOOD ST (4)Permit Types BLD ELE MEC PLM /�NEIM 1 ��Er\ X Permit Number: BLD2021-00199 Issued:01/15/2021 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 46 Site Address: 512 N PARKWOOD ST Legal Description: N TR 1591 LOT 93 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Reroof: Tear off existing material and replace with 2,800 sq. ft. of composition shingles over house and attached garage. Valuation: $2,500.00 Construcion Types: WA, , Total Fees paid for Permk: 341.50 People Associated with Project: Owner GREGORIO SANTAMARIA 512 N PARKWOOD ST ANAHEIM CA 92801.4558 Permit Applicant GREGORIO SANTAMARIA 512 N. PARKWOOD ST. ANAHEIM CA 92801 Type Electrical Fixtures City Type Plumbing Fixtures Qty Type Mechanical Fixtures City The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�f,HEIM �q< City of Anaheim o4 iO Building Division h i �OVND ED �W, Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 NOT COMPLETED INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-6041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subhoor or pour Floor slab until the follwing applicable items have been sianed Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor S ear Roof( eathi /Diaphragm/Frame) di al Mason einfdBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele.. Mec. 8 Fire) SG Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service